Summit Technology Group

How many solar installs has Summit Technology Group done in California, and which license number is on its installs?

Summit Technology Group has 335 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Apr 1, 2010 to Jul 29, 2026), most of them in Sonoma County (251), Napa County (40) and Marin County (25). CSLB lists license 793873 (SUMMIT TECHNOLOGY GROUP INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Summit Technology Group here carry more than one CSLB license number: 793873 on 299 (CSLB holder SUMMIT TECHNOLOGY GROUP INC, Santa Rosa) and 255064 on 15 (CSLB holder SUMMIT ELECTRIC INC, Santa Rosa), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
335
Last 24 months
79
Total capacity
3,460.1 kW DC
Median system size
7.6 kW DC
With battery storage
43.9% all time; 43.0% last 24 months
Third-party owned
0.0% of 335 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
40 installs, latest Jul 29, 2026
Ownership types recorded
none recorded
Median battery size
15 kWh (17 installs list a capacity)
First install
Apr 1, 2010
Latest install
Jul 29, 2026
Counties
9
Utilities
PGE 335
CSLB license
793873, 255064

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201080
201110
201240
201320
201430
201500
201610
201730
201860
201970
2020227
20215635
20225128
20235322
20244324
20253416
2026 (through Aug 31, 2026)4115

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

40 of its 335 interconnected installs (11.9% of the 335 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0257.5%not counted
NEM 2.027080.6%110 (40.7%)
Net Billing Tariff4011.9%32 (80.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Summit Technology Group’s installs. No residential system in the file lists a third-party owner name that matches Summit Technology Group exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 77 of Summit Technology Group’s 79 installs name a module maker in the “Generator Manufacturer” fields, and most of those (51, 66.2%) used modules recorded as Solaria.

In the last 24 months, 79 of Summit Technology Group’s 79 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (67, 84.8%) used inverters recorded as Enphase.

In the last 24 months, 31 of Summit Technology Group’s 79 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (14, 45.2%) used batteries recorded as Enphase.

121 of 147 battery-paired PG&E and SCE installs (82.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolaria51174
Mission Solar1113
REC939
Discover Energy Systems Corp.3not in top list
VSUN (Vietnam Sunergy)3not in top list
Inverter makerEnphase67286
Tesla1333
FranklinWH414
Sol-Ark3not in top list
sonnen2not in top list
Battery makerEnphase1474
Tesla1125
FranklinWH414
sonnen26
SolarEdge1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 292 of 335 installs, inverters on 335. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Summit Technology Group as developer on 91 battery storage projects and as installer on 91 (91 name it as both), 91 projects in all with 2,028 kWh of storage. 57 have the status Paid, with $547,363 in current incentive allocations. Applications were received from Aug 8, 2019 to Jul 15, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid571,327$547,363
Cancelled34701$245,831

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage54984$176,34131$106,075
Large-Scale Storage20574$165,20612$101,375
Equity Resiliency17470$451,64714$339,912

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
793873SUMMIT TECHNOLOGY GROUP INC (Corporation)CLEARC-10 Electrical ContractorApr 16, 2001Jun 30, 2028299
255064SUMMIT ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorOct 18, 1968Sep 30, 202715

License numbers are the ones the utilities recorded on the interconnection applications (317 of 335 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 793873, 255064. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Summit Technology Group’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192021202220242025Total
City and County of San Francisco7938730001124
unincorporated Marin County7938731121005

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma251
Napa40
Marin25
Alameda5
Contra Costa5
San Francisco4
San Mateo3
El Dorado1
Lake1

Top cities

CityInstalls
Santa Rosa124
Rohnert Park38
Napa18
Sebastopol18
Healdsburg17
Saint Helena14
Sonoma10
Calistoga8
Windsor8
San Rafael5
Cloverdale4
Kenwood4
Mill Valley4
Penngrove4
San Francisco4

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUMMIT TECHNOLOGY GROUP INC266
Summit Technology Group55
Summit Technology Group, Inc.11
SUMMIT TECHNOLOGY GROUP1
Summit Technology Group Inc1
Summit Technology Group Inc.1

Common questions

Where does Summit Technology Group install solar?

Its installs are spread across 9 counties. The most are in Sonoma County (251 installs), followed by Napa County (40).

How often does Summit Technology Group install batteries with solar?

43.9% of its interconnected solar installs include battery storage across all years, and 43.0% in the last 24 months (34 of 79).

How many Summit Technology Group installs are under NEM 3.0 (the Net Billing Tariff)?

40 of its 335 interconnected installs (11.9% of the 335 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.