Solar Renewable Energy

How many solar installs has Solar Renewable Energy done in California, and which license number is on its installs?

Solar Renewable Energy has 420 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Dec 10, 2014 to Aug 3, 2026), most of them in San Diego County (361), Orange County (43) and Riverside County (12). CSLB lists license 990943 (SOLAR RENEWABLE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
420
Last 24 months
51
Total capacity
2,888.6 kW DC
Median system size
6.2 kW DC
With battery storage
12.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 60.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
8.6% of 417 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
70 installs, latest Aug 3, 2026
Ownership types recorded
PPA 31, lease 2, prepaid lease 3
Median battery size
13.5 kWh (3 installs list a capacity)
First install
Dec 10, 2014
Latest install
Aug 3, 2026
Counties
6
Utilities
SDGE 395, SCE 24, PGE 1
CSLB license
990943

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201420
2015130
2016230
2017410
2018850
2019710
2020260
2021150
2022270
2023430
2024321
2025280
2026 (through Aug 31, 2026)142

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

70 of its 420 interconnected installs (16.7% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0368.6%not counted
NEM 2.031474.8%0 (0.0%)
Net Billing Tariff7016.7%3 (60.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 36 of Solar Renewable Energy’s installs the utility recorded a third-party ownership type: PPA 31, lease 2, prepaid lease 3, other 0. No residential system in the file lists a third-party owner name that matches Solar Renewable Energy exactly.

Third-party owner named on its installsInstalls
Solar Renewable Ener29
SunVantage6
Everbright LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 48 of Solar Renewable Energy’s 51 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 31.3%) used modules recorded as HDHYUNDAIENERGYSOLUTIONSCO.,LTD..

In the last 24 months, 51 of Solar Renewable Energy’s 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (40, 78.4%) used inverters recorded as Enphase.

In the last 24 months, 3 of Solar Renewable Energy’s 51 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHDHYUNDAIENERGYSOLUTIONSCO.,LTD.15not in top list
VietnamSunergyJointStockCompany15not in top list
Qcells556
Hyundai2not in top list
JA Solar2not in top list
Inverter makerEnphase40270
Tesla99
Fortress Power LLC1not in top list
Sol-Ark15
SolarEdge1133
Battery makerEnphase11
Fortress Power LLC11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 400 of 420 installs, inverters on 420. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Renewable Energy as developer on 24 battery storage projects and as installer on 24 (23 name it as both), 25 projects in all with 336 kWh of storage. 12 have the status Paid, with $61,437 in current incentive allocations. Applications were received from Feb 26, 2018 to Jun 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid12131$61,437
Reserved113$21,071
Cancelled12192$113,695

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage19160$39,66311$24,238
Residential Solar and Storage Equity - AB 209336$52,3520$0
Equity Resiliency2101$92,0091$37,199
Large-Scale Storage140$12,1800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990943SOLAR RENEWABLE ENERGY (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorFeb 27, 2014Jun 30, 2028391

License numbers are the ones the utilities recorded on the interconnection applications (393 of 420 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 990943. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Renewable Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County990943443711810127114144

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego361
Orange43
Riverside12
Los Angeles2
Monterey1
San Bernardino1

Top cities

CityInstalls
Escondido98
San Diego71
Vista37
Ramona33
Chula Vista18
Oceanside18
San Marcos18
La Mesa12
Fallbrook10
Bonita9
Carlsbad9
El Cajon9
Poway8
Lakeside5
Murrieta5

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Renewable Energy404
SOLAR RENEWABLE ENERGY16

Common questions

Where does Solar Renewable Energy install solar?

Its installs are spread across 6 counties. The most are in San Diego County (361 installs), followed by Orange County (43).

How often does Solar Renewable Energy install batteries with solar?

12.0% of its interconnected solar installs include battery storage across all years, and 60.0% in the last 24 months (3 of 5). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar Renewable Energy installs are under NEM 3.0 (the Net Billing Tariff)?

70 of its 420 interconnected installs (16.7% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.