Eriksson

How many solar installs has Eriksson done in California, and which license number is on its installs?

Eriksson has 1,221 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Oct 30, 2013 to Aug 20, 2026), most of them in San Diego County (1,106) and Orange County (115). CSLB lists license 988146 (SOLAR SYMPHONY CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,221
Last 24 months
65
Total capacity
8,175.3 kW DC
Median system size
5.9 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
2.8% of 1,160 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
83 installs, latest Aug 20, 2026
Ownership types recorded
PPA 2, lease 2, other 29
First install
Oct 30, 2013
Latest install
Aug 20, 2026
Counties
2
Utilities
SDGE 1,221
CSLB license
988146

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
2014400
20151160
20161510
2017770
20181200
20191870
2020840
2021630
2022910
20231920
2024380
2025250
2026 (through Aug 31, 2026)360

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

83 of its 1,221 interconnected installs (6.8% of the 1,221 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.025621.0%not counted
NEM 2.088272.2%not recorded
Net Billing Tariff836.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 33 of Eriksson’s installs the utility recorded a third-party ownership type: PPA 2, lease 2, prepaid lease 0, other 29. No residential system in the file lists a third-party owner name that matches Eriksson exactly.

Third-party owner named on its installsInstalls
Solar Symphony33

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 64 of Eriksson’s 65 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (28, 43.8%) used modules recorded as SEGSolarInc..

In the last 24 months, 65 of Eriksson’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 72.3%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEGSolarInc.2828
Qcells16799
JA Solar12not in top list
Aptos Solar3not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.3not in top list
Inverter makerTesla4756
Enphase17501
SolarEdge1548

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,206 of 1,221 installs, inverters on 1,221. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
988146SOLAR SYMPHONY CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorOct 31, 2013Oct 31, 2027996

License numbers are the ones the utilities recorded on the interconnection applications (996 of 1,221 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 988146. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Eriksson’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County9881462031691021324106

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego1,106
Orange115

Top cities

CityInstalls
San Diego431
Carlsbad97
Escondido91
Oceanside51
San Marcos45
Vista37
Chula Vista35
Poway35
Fallbrook34
El Cajon33
Coronado32
La Mesa25
Laguna Niguel22
La Jolla21
San Clemente19

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Eriksson1,221

Common questions

Where does Eriksson install solar?

Its installs are spread across 2 counties. The most are in San Diego County (1,106 installs), followed by Orange County (115).

How often does Eriksson install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Eriksson installs are under NEM 3.0 (the Net Billing Tariff)?

83 of its 1,221 interconnected installs (6.8% of the 1,221 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.