SWELL CONTRACTORS

How many solar installs has SWELL CONTRACTORS done in California, and which license number is on its installs?

SWELL CONTRACTORS has 420 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Feb 11, 2020 to Jul 31, 2026), most of them in Humboldt County (51), Ventura County (50) and Santa Clara County (35). The license number recorded on most of its installs, 1021183, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
420
Last 24 months
32
Total capacity
3,256.2 kW DC
Median system size
6.9 kW DC
With battery storage
81.2% all time; 62.5% last 24 months
Third-party owned
0.0% of 420 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Jul 31, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (103 installs list a capacity)
First install
Feb 11, 2020
Latest install
Jul 31, 2026
Counties
35
Utilities
PGE 319, SCE 101
CSLB license
1021183

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
20202424
2021116109
20229684
202311477
20244632
20251711
2026 (through Aug 31, 2026)74

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 420 interconnected installs (3.6% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07618.1%not counted
NEM 2.032978.3%251 (76.3%)
Net Billing Tariff153.6%14 (93.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SWELL CONTRACTORS’s installs. No residential system in the file lists a third-party owner name that matches SWELL CONTRACTORS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of SWELL CONTRACTORS’ 32 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 61.5%) used modules recorded as Qcells.

In the last 24 months, 32 of SWELL CONTRACTORS’ 32 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 81.3%) used inverters recorded as Tesla.

In the last 24 months, 7 of SWELL CONTRACTORS’ 32 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as Tesla.

222 of 341 battery-paired PG&E and SCE installs (65.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells883
REC463
Panasonic1not in top list
Inverter makerTesla26277
Enphase20260
SolarEdge372
Fronius2not in top list
SMA237
Battery makerTesla7217

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 258 of 420 installs, inverters on 420. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1021183Not found in the CSLB License Master file pulled Nov 4, 2026420

License numbers are the ones the utilities recorded on the interconnection applications (420 of 420 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SWELL CONTRACTORS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021202220232024Total
City and County of San Francisco1021183111205
unincorporated San Diego County10211830582131371409
unincorporated Marin County1021183400004

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Humboldt51
Ventura50
Santa Clara35
Sonoma29
El Dorado25
Alameda23
Contra Costa21
Marin20
San Mateo20
Santa Barbara20
Los Angeles18
Monterey13
Placer13
San Luis Obispo12
Santa Cruz12
Orange8
Nevada6
Kern5
Yolo4
Calaveras3
Mono3
Napa3
Plumas3
San Francisco3
Solano3
Amador2
Inyo2
Lake2
Madera2
Mariposa2
Tehama2
Tulare2
Butte1
Riverside1
Shasta1

Top cities

CityInstalls
Eureka14
Santa Barbara13
Ventura12
Arcata10
San Jose10
Santa Rosa10
Ojai9
Mckinleyville8
Placerville8
Oakland7
Los Gatos6
Sonoma6
Alamo5
Bakersfield5
Cupertino5

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SWELL CONTRACTORS420

Common questions

Where does SWELL CONTRACTORS install solar?

Its installs are spread across 35 counties. The most are in Humboldt County (51 installs), followed by Ventura County (50).

How often does SWELL CONTRACTORS install batteries with solar?

81.2% of its interconnected solar installs include battery storage across all years, and 62.5% in the last 24 months (20 of 32).

How many SWELL CONTRACTORS installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 420 interconnected installs (3.6% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.