How many solar installs has Sun River Solar dba done in California, and which license number is on its installs?

Sun River Solar dba has 44 residential solar installs interconnected in California, active in the records from 2018 through 2022 (Apr 6, 2018 to Dec 5, 2022), most of them in Nevada County (11), Placer County (11) and El Dorado County (10). CSLB lists license 970886 (SUNRIVER SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
0
Total capacity
310.6 kW DC
Median system size
7.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 6, 2018
Latest install
Dec 5, 2022
Counties
6
Utilities
PGE 44
CSLB license
970886

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018180
2019250
202000
202100
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.044100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sun River Solar dba’s installs. No residential system in the file lists a third-party owner name that matches Sun River Solar dba exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 44 of Sun River Solar dba’s 44 installs name a module maker in the “Generator Manufacturer” fields, and most of those (32, 72.7%) used modules recorded as Qcells.

Across all years, 44 of Sun River Solar dba’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (41, 93.2%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells032
REC05
Canadian Solar04
LG02
Trina Solar01
Inverter makerSolarEdge041
SMA02
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 44 installs, inverters on 44. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970886SUNRIVER SOLAR INC (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorMar 14, 2012Mar 31, 202844

License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970886. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Nevada11
Placer11
El Dorado10
Sutter8
Yuba3
Butte1

Top cities

CityInstalls
Yuba City8
Grass Valley5
Auburn4
El Dorado Hills4
Penn Valley4
Placerville3
Browns Valley2
Granite Bay2
Lincoln2
Applegate1
Forest Ranch1
Meadow Vista1
Nevada City1
Penryn1
Pilot Hill1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sun River Solar dba37
Sun River Solar7

Common questions

Where does Sun River Solar dba install solar?

Its installs are spread across 6 counties. The most are in Nevada County (11 installs), followed by Placer County (11).

How often does Sun River Solar dba install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Sun River Solar dba installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.