SPG Solar, Inc.

How many solar installs has SPG Solar, Inc. done in California, and which license number is on its installs?

SPG Solar, Inc. has 518 residential solar installs interconnected in California, active in the records from 2005 through 2014 (Mar 11, 2005 to Jul 30, 2014), most of them in Marin County (149), Butte County (106) and Sonoma County (88). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
518
Last 24 months
0
Total capacity
3,391 kW DC
Median system size
4.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.4% of 492 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 2
First install
Mar 11, 2005
Latest install
Jul 30, 2014
Counties
23
Utilities
PGE 484, SDGE 25, SCE 9
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200530
2006650
20071460
20081550
20091270
2010160
201110
201240
201300
201410
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 518 interconnected installs with a tariff recorded (518) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0518100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of SPG Solar, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. Across all installers, 2 residential systems list a third-party owner name that matches SPG Solar, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SPG Solar, Inc.2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 476 of SPG Solar, Inc.’s 518 installs name a module maker in the “Generator Manufacturer” fields, and most of those (361, 75.8%) used modules recorded as Kyocera.

Across all years, 499 of SPG Solar, Inc.’s 518 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (324, 64.9%) used inverters recorded as Fronius.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerKyocera0361
Suntech049
Sharp048
Sanyo014
BP Solar03
Inverter makerFronius0324
SMA095
Xantrex Technology Inc.058
Magnetek019
Advanced Energy, Inc.04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 476 of 518 installs, inverters on 499. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (9 of 518 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Marin149
Butte106
Sonoma88
Contra Costa35
Napa28
Alameda22
San Diego22
Solano14
Glenn8
Sutter8
Yuba8
Shasta6
Orange5
San Bernardino4
Lake3
Tehama3
Colusa2
Riverside2
Los Angeles1
Nevada1
Placer1
San Benito1
San Francisco1

Top cities

CityInstalls
Chico55
Oroville35
Novato26
San Rafael26
Mill Valley25
Rohnert Park24
Santa Rosa19
Napa15
Petaluma14
Kentfield11
Tiburon11
Larkspur9
Berkeley8
Saint Helena8
San Anselmo8

Names as recorded by the utilities

The utilities recorded this installer under 20 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SPG Solar, Inc.268
SPG Solar, Inc90
SPG Solar89
SPG Solar Inc35
SPG Solar Inc.9
SPG SOLAR, INC.8
SPG Solar, inc.4
SPG SOLAR INC3
Spg Solar1
SPG Solar , Inc1
SPG Solar , Inc.1
SPG Solar Co., Inc.1
SPG solar Inc1
SPG Solar, INc1
SPG Solar, Inc,.1
SPG Solar, Inc.,1
SPG Solar. Inc.1
SPG Solar., Inc.1
SPG Solar.Inc1
SPG,Solar, Inc1

Common questions

Where does SPG Solar, Inc. install solar?

Its installs are spread across 23 counties. The most are in Marin County (149 installs), followed by Butte County (106).

How often does SPG Solar, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SPG Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 518 interconnected installs with a tariff recorded (518) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.