Next Door Home Construction

How many solar installs has Next Door Home Construction done in California, and which license number is on its installs?

Next Door Home Construction has 182 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Apr 28, 2020 to Aug 21, 2026), most of them in San Diego County (149), Orange County (17) and Los Angeles County (5). CSLB lists license 1054136 (NEXT DOOR HOME UPGRADES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
182
Last 24 months
22
Total capacity
1,380.3 kW DC
Median system size
7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
1.6% of 182 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
23 installs, latest Aug 21, 2026
Ownership types recorded
PPA 3
First install
Apr 28, 2020
Latest install
Aug 21, 2026
Counties
10
Utilities
SDGE 164, SCE 12, PGE 6
CSLB license
1054136

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020200
2021400
2022510
2023430
202480
2025140
2026 (through Aug 31, 2026)60

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

23 of its 182 interconnected installs (12.6% of the 182 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.015987.4%0 (0.0%)
Net Billing Tariff2312.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of Next Door Home Construction’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Next Door Home Construction exactly.

Third-party owner named on its installsInstalls
Next Door Home Upgra3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 22 of Next Door Home Construction’s 22 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10, 45.5%) used modules recorded as Znshine.

In the last 24 months, 22 of Next Door Home Construction’s 22 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 95.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine1013
Trina Solar5not in top list
Aptos Solar239
Axitec1not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.1not in top list
Inverter makerEnphase21176
Tesla1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 168 of 182 installs, inverters on 182. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Next Door Home Construction as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 38 kWh of storage. 2 have the status Paid, with $11,444 in current incentive allocations. Applications were received from Oct 21, 2021 to Dec 7, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid219$11,444
Reserved219$19,036

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency329$28,7421$9,706
Small Residential Storage110$1,7381$1,738

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1054136NEXT DOOR HOME UPGRADES (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorMay 30, 2019May 31, 2027182

License numbers are the ones the utilities recorded on the interconnection applications (182 of 182 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1054136. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Next Door Home Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202020212022202320242026Total
unincorporated San Diego County105413612872121

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego149
Orange17
Los Angeles5
Monterey3
Riverside2
San Bernardino2
San Benito1
San Luis Obispo1
Santa Clara1
Ventura1

Top cities

CityInstalls
San Diego61
Chula Vista11
Carlsbad7
El Cajon7
Oceanside7
San Clemente7
Encinitas5
Escondido5
Imperial Beach5
San Marcos5
Vista5
La Mesa4
Poway4
Spring Valley4
La Jolla3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Next Door Home Construction164
NEXT DOOR HOME CONSTRUCTION18

Common questions

Where does Next Door Home Construction install solar?

Its installs are spread across 10 counties. The most are in San Diego County (149 installs), followed by Orange County (17).

How often does Next Door Home Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Next Door Home Construction installs are under NEM 3.0 (the Net Billing Tariff)?

23 of its 182 interconnected installs (12.6% of the 182 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.