Guyou Construction

How many solar installs has Guyou Construction done in California, and which license number is on its installs?

Guyou Construction has 1,373 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jun 27, 2014 to Aug 24, 2026), most of them in Orange County (295), Riverside County (292) and San Diego County (259). CSLB lists license 997054 (GUYOU CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,373
Last 24 months
70
Total capacity
11,056.4 kW DC
Median system size
7.3 kW DC
With battery storage
15.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 75.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
4.0% of 1,361 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
100 installs, latest Aug 24, 2026
Ownership types recorded
PPA 39, lease 15
Median battery size
13.5 kWh (157 installs list a capacity)
First install
Jun 27, 2014
Latest install
Aug 24, 2026
Counties
20
Utilities
SCE 957, SDGE 362, PGE 54
CSLB license
997054

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201460
2015160
2016450
2017510
2018930
20191561
20202173
202129311
202218519
202318333
20246954
20253523
2026 (through Aug 31, 2026)2414

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

100 of its 1,373 interconnected installs (7.3% of the 1,373 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0936.8%not counted
NEM 2.01,18085.9%84 (10.0%)
Net Billing Tariff1007.3%74 (85.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 54 of Guyou Construction’s installs the utility recorded a third-party ownership type: PPA 39, lease 15, prepaid lease 0, other 0. Across all installers, 7 residential systems list a third-party owner name that matches Guyou Construction exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunRun19
Spruce8
GUYOU CONSTRUCTION INC7
SUNNOVA SALES5
vivint4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 67 of Guyou Construction’s 70 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (20, 29.9%) used modules recorded as LONGi.

In the last 24 months, 70 of Guyou Construction’s 70 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (39, 55.7%) used inverters recorded as Enphase.

In the last 24 months, 46 of Guyou Construction’s 70 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (32, 69.6%) used batteries recorded as Tesla.

151 of 158 battery-paired PG&E and SCE installs (95.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi20not in top list
Canadian Solar16285
Qcells16365
JA Solar8not in top list
LG564
Inverter makerEnphase39784
Tesla2148
SolarEdge12363
ABB3not in top list
SMA2not in top list
Battery makerTesla3287
Enphase731
FranklinWH419
SolarEdge22
LG110

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,265 of 1,373 installs, inverters on 1,373. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Guyou Construction as developer on 2 battery storage projects and as installer on 3 (2 name it as both), 3 projects in all with 63 kWh of storage. 1 have the status Paid, with $3,960 in current incentive allocations. Applications were received from Aug 19, 2020 to Aug 1, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid126$3,960
Cancelled236$5,943

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage363$9,9031$3,960

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
997054GUYOU CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor; C-46 Solar ContractorSep 23, 2014Sep 30, 20281,353

License numbers are the ones the utilities recorded on the interconnection applications (1,358 of 1,373 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 997054. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Guyou Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County99705414232072713178

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange295
Riverside292
San Diego259
San Bernardino234
Los Angeles216
Fresno23
Ventura13
Kern7
San Joaquin7
Tulare7
Madera4
Humboldt3
Kings3
Santa Barbara3
Alameda2
Calaveras1
Mariposa1
Merced1
San Mateo1
Yolo1

Top cities

CityInstalls
San Diego86
Corona42
Mission Viejo34
Riverside32
Oceanside26
Chula Vista24
Apple Valley23
Hesperia23
San Bernardino22
Hemet21
Long Beach20
Murrieta20
Escondido18
Fontana18
Menifee18

Names as recorded by the utilities

The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GUYOU CONSTRUCTION INC829
Guyou Construction519
GUYOU CONSTRUCTION10
Guyou Construction Inc.6
Guyou Construction Inc3
Guyou Construction INC2
guyou Construction1
Guyou Construction INC.1
Guyou Construction, INC.1
GUYOU-CONSTRUCTION-INC1

Common questions

Where does Guyou Construction install solar?

Its installs are spread across 20 counties. The most are in Orange County (295 installs), followed by Riverside County (292).

How often does Guyou Construction install batteries with solar?

15.6% of its interconnected solar installs include battery storage across all years, and 75.4% in the last 24 months (46 of 61). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Guyou Construction installs are under NEM 3.0 (the Net Billing Tariff)?

100 of its 1,373 interconnected installs (7.3% of the 1,373 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.