Fuzion Energy
How many solar installs has Fuzion Energy done in California, and which license number is on its installs?
Fuzion Energy has 1,256 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Apr 11, 2017 to Aug 28, 2026), most of them in Kern County (1,103), Santa Barbara County (38) and Tulare County (28). CSLB lists license 1025073 (FUZION ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, expires Mar 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 1,256
- Last 24 months
- 239
- Total capacity
- 9,848.1 kW DC
- Median system size
- 7.4 kW DC
- With battery storage
- 22.0% all time; 69.0% last 24 months
- Third-party owned
- 0.1% of 1,256 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 293 installs, latest Aug 28, 2026
- Ownership types recorded
- lease 1
- Median battery size
- 10 kWh (232 installs list a capacity)
- First install
- Apr 11, 2017
- Latest install
- Aug 28, 2026
- Counties
- 25
- Utilities
- PGE 1,009, SCE 247
- CSLB license
- 1025073
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 7 | 0 |
| 2018 | 101 | 0 |
| 2019 | 153 | 0 |
| 2020 | 126 | 0 |
| 2021 | 134 | 6 |
| 2022 | 217 | 16 |
| 2023 | 222 | 39 |
| 2024 | 100 | 91 |
| 2025 | 122 | 76 |
| 2026 (through Aug 31, 2026) | 74 | 48 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
293 of its 1,256 interconnected installs (23.3% of the 1,256 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 6 | 0.5% | not counted |
| NEM 2.0 | 957 | 76.2% | 34 (3.6%) |
| Net Billing Tariff | 293 | 23.3% | 240 (81.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of Fuzion Energy’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Fuzion Energy exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sunnova Energy Corporation | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 238 of Fuzion Energy’s 239 installs name a module maker in the “Generator Manufacturer” fields, and most of those (187, 78.6%) used modules recorded as Mission Solar.
In the last 24 months, 239 of Fuzion Energy’s 239 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (127, 53.1%) used inverters recorded as SolarEdge.
In the last 24 months, 170 of Fuzion Energy’s 239 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (115, 67.6%) used batteries recorded as SolarEdge.
260 of 276 battery-paired PG&E and SCE installs (94.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Mission Solar | 187 | 257 |
| Qcells | 29 | not in top list | |
| CertainTeed | 14 | not in top list | |
| Panasonic | 9 | 227 | |
| Hyundai | 8 | not in top list | |
| Inverter maker | SolarEdge | 127 | 797 |
| Enphase | 86 | 407 | |
| Tesla | 37 | 43 | |
| Power-One | 3 | not in top list | |
| sonnen | 2 | not in top list | |
| Battery maker | SolarEdge | 115 | 181 |
| Tesla | 32 | 32 | |
| Enphase | 21 | 44 | |
| sonnen | 2 | 6 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,223 of 1,256 installs, inverters on 1,255. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1025073 | FUZION ENERGY (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor | Mar 23, 2017 | Mar 31, 2027 | 1,255 |
License numbers are the ones the utilities recorded on the interconnection applications (1,256 of 1,256 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1025073. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Fuzion Home Services, Inc.: 150 installs, license 1025073
Counties
Top cities
| City | Installs |
|---|---|
| Bakersfield | 880 |
| Ridgecrest | 65 |
| Tehachapi | 41 |
| Goleta | 38 |
| Wasco | 21 |
| Delano | 17 |
| Shafter | 16 |
| Taft | 14 |
| Visalia | 11 |
| Clovis | 10 |
| Fresno | 9 |
| Porterville | 7 |
| Inyokern | 6 |
| Lake Isabella | 6 |
| Paso Robles | 6 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| FUZION ENERGY | 945 |
| Fuzion Energy | 311 |
Common questions
Where does Fuzion Energy install solar?
Its installs are spread across 25 counties. The most are in Kern County (1,103 installs), followed by Santa Barbara County (38).
How often does Fuzion Energy install batteries with solar?
22.0% of its interconnected solar installs include battery storage across all years, and 69.0% in the last 24 months (165 of 239).
How many Fuzion Energy installs are under NEM 3.0 (the Net Billing Tariff)?
293 of its 1,256 interconnected installs (23.3% of the 1,256 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.