Electrical Contractor

How many solar installs has Electrical Contractor done in California, and which license number is on its installs?

Electrical Contractor has 55 residential solar installs interconnected in California, active in the records from 2005 through 2026 (Oct 17, 2005 to Aug 13, 2026), most of them in Riverside County (12), Orange County (8) and Nevada County (7). CSLB lists license 1116039 (LP ELECTRICAL CONTRACTOR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
55
Last 24 months
42
Total capacity
385.2 kW DC
Median system size
6.7 kW DC
With battery storage
69.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
60.0% of 55 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
42 installs, latest Aug 13, 2026
Ownership types recorded
PPA 28, lease 5
Median battery size
13.5 kWh (35 installs list a capacity)
First install
Oct 17, 2005
Latest install
Aug 13, 2026
Counties
16
Utilities
SCE 31, PGE 22, SDGE 2
CSLB license
1116039

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200520
200690
200710
200810
200900
201000
201100
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202420
20251211
2026 (through Aug 31, 2026)2826

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

42 of its 55 interconnected installs (76.4% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01323.6%not counted
NEM 2.000.0%0
Net Billing Tariff4276.4%37 (92.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 33 of Electrical Contractor’s installs the utility recorded a third-party ownership type: PPA 28, lease 5, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Electrical Contractor exactly.

Third-party owner named on its installsInstalls
VOLT7
AXESS6
BHI SolarTech LLC5
Goodleap5
Anadro Inc2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 42 of Electrical Contractor’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 38.1%) used modules recorded as Qcells.

In the last 24 months, 42 of Electrical Contractor’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 76.2%) used inverters recorded as Tesla.

In the last 24 months, 32 of Electrical Contractor’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (28, 87.5%) used batteries recorded as Tesla.

32 of 37 battery-paired PG&E and SCE installs (86.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1616
JA Solar88
Hyundai77
CertainTeed55
Canadian Solar2not in top list
Inverter makerTesla3232
Enphase77
Growatt22
SolarEdge11
Battery makerTesla2828
Enphase44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 55 of 55 installs, inverters on 55. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1116039LP ELECTRICAL CONTRACTOR INC (Corporation)CLEARC-10 Electrical ContractorFeb 5, 2024Feb 29, 202842

License numbers are the ones the utilities recorded on the interconnection applications (42 of 55 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1116039. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Electrical Contractor’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202420252026Total
unincorporated San Diego County11160392439

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside12
Orange8
Nevada7
San Bernardino6
Los Angeles4
Santa Clara3
El Dorado2
Kern2
Placer2
San Diego2
Solano2
Marin1
Monterey1
Sacramento1
Stanislaus1
Ventura1

Top cities

CityInstalls
Brea5
Grass Valley4
Hemet4
Moreno Valley2
Penn Valley2
San Jose2
Westlake Village2
Agoura Hills1
Auburn1
Bakersfield1
Benicia1
Canyon Lake1
Chino Hills1
Davis1
Eastvale1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LP ELECTRICAL CONTRACTOR INC42
Electrical Contractor13

Common questions

Where does Electrical Contractor install solar?

Its installs are spread across 16 counties. The most are in Riverside County (12 installs), followed by Orange County (8).

How often does Electrical Contractor install batteries with solar?

69.8% of its interconnected solar installs include battery storage across all years, and 92.5% in the last 24 months (37 of 40). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Electrical Contractor installs are under NEM 3.0 (the Net Billing Tariff)?

42 of its 55 interconnected installs (76.4% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.