DEVIL DOG ENERGY

How many solar installs has DEVIL DOG ENERGY done in California, and which license number is on its installs?

DEVIL DOG ENERGY has 179 residential solar installs interconnected in California, active in the records from 2021 through 2026 (May 12, 2021 to Jul 23, 2026), most of them in Riverside County (83), San Bernardino County (44) and Los Angeles County (25). CSLB lists license 1073880 (DEVIL DOG ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
179
Last 24 months
71
Total capacity
1,565.2 kW DC
Median system size
8.4 kW DC
With battery storage
53.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.7% of 179 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
93 installs, latest Jul 23, 2026
Ownership types recorded
PPA 3
Median battery size
14.3 kWh (84 installs list a capacity)
First install
May 12, 2021
Latest install
Jul 23, 2026
Counties
12
Utilities
SCE 166, PGE 11, SDGE 2
CSLB license
1073880

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
2022280
2023553
20243937
20253130
2026 (through Aug 31, 2026)2524

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

93 of its 179 interconnected installs (52.0% of the 179 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08648.0%2 (2.4%)
Net Billing Tariff9352.0%92 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of DEVIL DOG ENERGY’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches DEVIL DOG ENERGY exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Devil Dog Energy2
Engine corp.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 70 of DEVIL DOG ENERGY’s 71 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (34, 48.6%) used modules recorded as Qcells.

In the last 24 months, 71 of DEVIL DOG ENERGY’s 71 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (69, 97.2%) used inverters recorded as Enphase.

In the last 24 months, 69 of DEVIL DOG ENERGY’s 71 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (44, 63.8%) used batteries recorded as Enphase.

94 of 94 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3459
JA Solar1515
LONGi1414
Canadian Solar459
JinkoSolar2not in top list
Inverter makerEnphase69127
FranklinWH33
Qcells1not in top list
SolarEdge138
Battery makerEnphase4466
FranklinWH2326
SolarEdge11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 170 of 179 installs, inverters on 179. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1073880DEVIL DOG ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorMar 9, 2021Mar 31, 2027179

License numbers are the ones the utilities recorded on the interconnection applications (179 of 179 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1073880. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list DEVIL DOG ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202320252026Total
unincorporated San Diego County10738801214

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside83
San Bernardino44
Los Angeles25
Orange11
Santa Clara3
Ventura3
Contra Costa2
Fresno2
Kern2
San Diego2
Madera1
Sutter1

Top cities

CityInstalls
Hemet36
Fontana7
Perris5
Beaumont4
Menifee4
Redlands4
Rialto4
San Jacinto4
Temecula4
Cathedral City3
Desert Hot Springs3
Eastvale3
Monterey Park3
Murrieta3
Riverside3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DEVIL DOG ENERGY179

Common questions

Where does DEVIL DOG ENERGY install solar?

Its installs are spread across 12 counties. The most are in Riverside County (83 installs), followed by San Bernardino County (44).

How often does DEVIL DOG ENERGY install batteries with solar?

53.1% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (69 of 69). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many DEVIL DOG ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

93 of its 179 interconnected installs (52.0% of the 179 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.