CMS CONSTRUCTION has 35 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Dec 18, 2025 to Aug 28, 2026), most of them in Kern County (4), Los Angeles County (4) and San Joaquin County (4). CSLB lists license 1139450 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
35
Last 24 months
35
Total capacity
193.4 kW DC
Median system size
5 kW DC
With battery storage
71.4% all time; 71.4% last 24 months
Third-party owned
82.9% of 35 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
29 installs, latest Aug 28, 2026
Ownership types recorded
PPA 18, lease 8, other 3
Median battery size
14 kWh (11 installs list a capacity)
First install
Dec 18, 2025
Latest install
Aug 28, 2026
Counties
17
Utilities
PGE 22, SCE 13
CSLB license
1139450

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
202511
2026 (through Aug 31, 2026)3424

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

29 of its 35 interconnected installs (82.9% of the 35 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0617.1%4 (66.7%)
Net Billing Tariff2982.9%21 (72.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 29 of CMS CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 18, lease 8, prepaid lease 0, other 3. No residential system in the file lists a third-party owner name that matches CMS CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
GOODLEAP, LLC20
EnFin3
Sunnova Energy Corporation3
Enfin Freedom1
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of CMS CONSTRUCTION’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (22, 62.9%) used modules recorded as Qcells.

In the last 24 months, 35 of CMS CONSTRUCTION’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (22, 62.9%) used inverters recorded as Enphase.

In the last 24 months, 22 of CMS CONSTRUCTION’s 35 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (12, 54.5%) used batteries recorded as Tesla.

22 of 25 battery-paired PG&E and SCE installs (88.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2222
JA Solar66
Canadian Solar44
EG433
JinkoSolar11
Inverter makerEnphase2222
SolarEdge1111
Tesla1111
EG433
FranklinWH22
Battery makerTesla1212
SolarEdge66
FranklinWH22
Enphase11
SunPower11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 35 installs, inverters on 35. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1139450Sole owner license (name not shown)CLEAR, FAM Sup Tmp LicB General Building ContractorJun 25, 2025Jun 30, 202735

License numbers are the ones the utilities recorded on the interconnection applications (35 of 35 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1139450. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern4
Los Angeles4
San Joaquin4
Tulare4
Fresno3
Solano3
Riverside2
Yuba2
Alameda1
Madera1
Monterey1
Nevada1
Orange1
San Bernardino1
San Mateo1
Sutter1
Ventura1

Top cities

CityInstalls
Bakersfield4
Clovis2
Plumas Lake2
Stockton2
Vacaville2
Visalia2
Auburn1
Canyon Lake1
Chatsworth1
Daly City1
Fairfield1
Fontana1
Fremont1
Irvine1
Los Angeles1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CMS CONSTRUCTION35

Common questions

Where does CMS CONSTRUCTION install solar?

Its installs are spread across 17 counties. The most are in Kern County (4 installs), followed by Los Angeles County (4).

How often does CMS CONSTRUCTION install batteries with solar?

71.4% of its interconnected solar installs include battery storage across all years, and 71.4% in the last 24 months (25 of 35).

How many CMS CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

29 of its 35 interconnected installs (82.9% of the 35 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.