Aveyo

How many solar installs has Aveyo done in California, and which license number is on its installs?

Aveyo has 98 residential solar installs interconnected in California, active in the records from 2025 through 2026 (May 12, 2025 to Aug 19, 2026), most of them in Riverside County (22), Los Angeles County (19) and San Diego County (12). CSLB lists license 1110238 (AVEYO) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
98
Last 24 months
98
Total capacity
760.6 kW DC
Median system size
7.3 kW DC
With battery storage
94.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 94.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
77.6% of 98 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
98 installs, latest Aug 19, 2026
Ownership types recorded
PPA 76
Median battery size
13.5 kWh (78 installs list a capacity)
First install
May 12, 2025
Latest install
Aug 19, 2026
Counties
16
Utilities
SCE 60, PGE 24, SDGE 14
CSLB license
1110238

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20254035
2026 (through Aug 31, 2026)5844

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

98 of its 98 interconnected installs (100.0% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff98100.0%79 (94.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 76 of Aveyo’s installs the utility recorded a third-party ownership type: PPA 76, lease 0, prepaid lease 0, other 0. Across all installers, 11 residential systems list a third-party owner name that matches Aveyo exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Goodleap31
EnFin18
Aveyo11
Sungage5
Lumifi4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 95 of Aveyo’s 98 installs name a module maker in the “Generator Manufacturer” fields, and most of those (92, 96.8%) used modules recorded as Qcells.

In the last 24 months, 98 of Aveyo’s 98 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (53, 54.1%) used inverters recorded as SolarEdge.

In the last 24 months, 71 of Aveyo’s 98 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (44, 62.0%) used batteries recorded as Tesla.

71 of 79 battery-paired PG&E and SCE installs (89.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells9292
Canadian Solar33
LG22
LONGi22
SolarWorld22
Inverter makerSolarEdge5353
Tesla3434
Enphase2929
SunPower22
ABB11
Battery makerTesla4444
SolarEdge2626
Enphase11
FranklinWH11
LG11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 95 of 98 installs, inverters on 98. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1110238AVEYO (Limited Liability)CLEARC-10 Electrical ContractorSep 19, 2023Sep 30, 202797

License numbers are the ones the utilities recorded on the interconnection applications (98 of 98 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1110238. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Aveyo’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
unincorporated San Diego County1110238235

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside22
Los Angeles19
San Diego12
Orange10
San Bernardino10
Alameda6
Santa Clara4
Sonoma4
Marin3
Contra Costa2
Amador1
Lake1
Mendocino1
Plumas1
San Mateo1
Ventura1

Top cities

CityInstalls
Alta Loma5
Winchester4
Huntington Park3
Lake Elsinore3
Long Beach3
Riverside3
San Bernardino3
San Jose3
Santa Ana3
Desert Hot Springs2
Escondido2
Fallbrook2
Jurupa Valley2
Oakland2
San Rafael2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AVEYO84
Aveyo14

Common questions

Where does Aveyo install solar?

Its installs are spread across 16 counties. The most are in Riverside County (22 installs), followed by Los Angeles County (19).

How often does Aveyo install batteries with solar?

94.0% of its interconnected solar installs include battery storage across all years, and 94.0% in the last 24 months (79 of 84). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Aveyo installs are under NEM 3.0 (the Net Billing Tariff)?

98 of its 98 interconnected installs (100.0% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.