True Power Solar

How many solar installs has True Power Solar done in California, and which license number is on its installs?

True Power Solar has 157 residential solar installs interconnected in California, active in the records from 2012 through 2024 (Mar 26, 2012 to Feb 2, 2024), most of them in San Diego County (72), Orange County (49) and Riverside County (15). CSLB lists license 970591 (TRUEPOWER SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
157
Last 24 months
0
Total capacity
1,148.1 kW DC
Median system size
6.5 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
26.2% of 103 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Dec 14, 2023
Ownership types recorded
PPA 1, lease 21, prepaid lease 5
First install
Mar 26, 2012
Latest install
Feb 2, 2024
Counties
9
Utilities
SDGE 117, SCE 37, PGE 3
CSLB license
970591

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012110
201390
201490
2015270
201650
2017140
2018160
2019140
2020200
202160
2022130
2023120
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 157 interconnected installs (0.6% of the 157 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Dec 14, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05836.9%not counted
NEM 2.09862.4%0 (0.0%)
Net Billing Tariff10.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 27 of True Power Solar’s installs the utility recorded a third-party ownership type: PPA 1, lease 21, prepaid lease 5, other 0. Across all installers, 2 residential systems list a third-party owner name that matches True Power Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower13
Tongtong Yin5
Sunrun3
Maochen Chang2
True Power Solar2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 120 of True Power Solar’s 157 installs name a module maker in the “Generator Manufacturer” fields, and most of those (84, 70.0%) used modules recorded as SunPower.

Across all years, 150 of True Power Solar’s 157 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (70, 46.7%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower084
Canadian Solar07
Qcells05
Suntech05
Hyundai04
Inverter makerSunPower070
SMA031
Enphase019
SolarEdge019
Power-One07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 120 of 157 installs, inverters on 150. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names True Power Solar as developer on 0 battery storage projects and as installer on 5 (0 name it as both), 5 projects in all with 57 kWh of storage. 3 have the status Paid, with $8,998 in current incentive allocations. Applications were received from Jan 4, 2019 to Mar 17, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid335$8,998
Cancelled222$38,633

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage444$10,7023$8,998
Large-Scale Storage113$36,9280$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970591TRUEPOWER SOLAR (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorMar 5, 2012Mar 31, 2028101

License numbers are the ones the utilities recorded on the interconnection applications (101 of 157 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970591. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list True Power Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022Total
unincorporated San Diego County9705911322311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego72
Orange49
Riverside15
Los Angeles10
San Bernardino6
Ventura2
Alameda1
Kern1
Santa Clara1

Top cities

CityInstalls
San Diego37
Coto de Caza10
Laguna Niguel9
San Juan Capo9
Dana Point6
Escondido5
Chula Vista4
La Mesa4
San Clemente4
Carlsbad3
Laguna Hills3
Rancho Santa Fe3
Bonsall2
Chino Hills2
Corona2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
True Power Solar156
TRUE POWER SOLAR1

Common questions

Where does True Power Solar install solar?

Its installs are spread across 9 counties. The most are in San Diego County (72 installs), followed by Orange County (49).

How often does True Power Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many True Power Solar installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 157 interconnected installs (0.6% of the 157 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.