How many solar installs has Solaron done in California, and which license number is on its installs?

Solaron has 289 residential solar installs interconnected in California, active in the records from 2010 through 2022 (Dec 4, 2010 to Aug 30, 2022), most of them in El Dorado County (61), Placer County (43) and Santa Clara County (39). CSLB lists license 561720 (SOLARON) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, C-53, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
289
Last 24 months
0
Total capacity
2,264.3 kW DC
Median system size
7.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
3.8% of 289 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 11
First install
Dec 4, 2010
Latest install
Aug 30, 2022
Counties
16
Utilities
PGE 289
CSLB license
561720

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201170
201270
2013210
2014580
2015650
2016440
2017320
2018200
2019200
2020110
202120
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 289 interconnected installs with a tariff recorded (289) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020671.3%not counted
NEM 2.08328.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 11 of Solaron’s installs the utility recorded a third-party ownership type: PPA 0, lease 11, prepaid lease 0, other 0. Across all installers, 6 residential systems list a third-party owner name that matches Solaron exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Solaron6
SunPower5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 289 of Solaron’s 289 installs name a module maker in the “Generator Manufacturer” fields, and most of those (265, 91.7%) used modules recorded as SunPower.

Across all years, 289 of Solaron’s 289 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (165, 57.1%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0265
LG011
SolarWorld09
Sanyo02
Suniva02
Inverter makerSunPower0165
SolarEdge078
SMA042
Fronius03
PV Powered01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 289 of 289 installs, inverters on 289. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
561720SOLARON (Corporation)CLEARC-46 Solar Contractor; C-53Mar 23, 1989Sep 30, 2027232

License numbers are the ones the utilities recorded on the interconnection applications (232 of 289 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 561720. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado61
Placer43
Santa Clara39
Yolo31
Alameda29
Solano26
Contra Costa24
San Joaquin12
San Mateo12
Napa5
Marin2
Amador1
Nevada1
Sacramento1
San Francisco1
Sutter1

Top cities

CityInstalls
El Dorado Hills36
San Jose20
Rocklin15
Vacaville13
Davis12
West Sacramento12
Pleasanton11
Shingle Springs10
Fremont9
Lincoln9
Granite Bay7
Livermore7
Redwood City7
Dixon6
Los Altos6

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solaron151
Solaron, Inc.90
SOLARON20
Solaron, Inc16
Solaron Inc6
Solaron Inc.6

Common questions

Where does Solaron install solar?

Its installs are spread across 16 counties. The most are in El Dorado County (61 installs), followed by Placer County (43).

How often does Solaron install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Solaron installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 289 interconnected installs with a tariff recorded (289) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.