SOLAR INSTALLATION GROUP, INC.
How many solar installs has SOLAR INSTALLATION GROUP, INC. done in California, and which license number is on its installs?
SOLAR INSTALLATION GROUP, INC. has 447 residential solar installs interconnected in California, active in the records from 2015 through 2024 (Jul 15, 2015 to Feb 26, 2024), most of them in Stanislaus County (141), San Joaquin County (109) and Tuolumne County (94). CSLB lists license 997639 (SIG SOLAR, S.I.G.) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 447
- Last 24 months
- 0
- Total capacity
- 3,285.3 kW DC
- Median system size
- 6.8 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 12.8% of 447 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 16, lease 41
- First install
- Jul 15, 2015
- Latest install
- Feb 26, 2024
- Counties
- 22
- Utilities
- PGE 445, SCE 2
- CSLB license
- 997639
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 2 | 0 |
| 2016 | 8 | 0 |
| 2017 | 39 | 0 |
| 2018 | 175 | 0 |
| 2019 | 214 | 0 |
| 2020 | 2 | 0 |
| 2021 | 0 | 0 |
| 2022 | 5 | 0 |
| 2023 | 1 | 0 |
| 2024 | 1 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 447 interconnected installs with a tariff recorded (447) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 11 | 2.5% | not counted |
| NEM 2.0 | 436 | 97.5% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 57 of SOLAR INSTALLATION GROUP, INC.’s installs the utility recorded a third-party ownership type: PPA 16, lease 41, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SOLAR INSTALLATION GROUP, INC. exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Lifestyle Energy | 47 |
| Spruce | 5 |
| PACE FUNDING | 3 |
| Green Pace Funding | 1 |
| HERO and Lifestyle Energy | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 447 of SOLAR INSTALLATION GROUP, INC.’s 447 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (175, 39.1%) used modules recorded as Qcells.
Across all years, 447 of SOLAR INSTALLATION GROUP, INC.’s 447 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (429, 96.0%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 0 | 175 |
| Silfab | 0 | 91 | |
| LG | 0 | 85 | |
| JinkoSolar | 0 | 57 | |
| SolarWorld | 0 | 28 | |
| Inverter maker | SolarEdge | 0 | 429 |
| Enphase | 0 | 14 | |
| Pika Energy | 0 | 3 | |
| SMA | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 447 of 447 installs, inverters on 447. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names SOLAR INSTALLATION GROUP, INC. as developer on 54 battery storage projects and as installer on 49 (49 name it as both), 54 projects in all with 938 kWh of storage. 30 have the status Paid, with $241,722 in current incentive allocations. Applications were received from May 16, 2018 to Dec 18, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 30 | 497 | $241,722 |
| Reserved | 7 | 111 | $179,295 |
| Pending Reservation | 1 | 26 | $76,538 |
| Cancelled | 16 | 304 | $257,268 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 25 | 420 | $62,444 | 18 | $47,654 |
| Equity Resiliency | 17 | 295 | $295,424 | 11 | $172,777 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 9 | 154 | $319,858 | 1 | $21,291 |
| Large-Scale Storage | 1 | 26 | $6,600 | 0 | $0 |
| Residential Solar and Storage Equity - AB 209 POU | 1 | 13 | $37,496 | 0 | $0 |
| Residential Solar and Storage Equity - Ratepayer | 1 | 30 | $33,000 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 997639 | SIG SOLAR, S.I.G. (Corporation) | CLEAR | C-10 Electrical Contractor; C-46 Solar Contractor | Oct 16, 2014 | Oct 31, 2028 | 445 |
License numbers are the ones the utilities recorded on the interconnection applications (447 of 447 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 997639. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- SIG SOLAR, S.I.G.: 2,200 installs, license 997639
Counties
Top cities
| City | Installs |
|---|---|
| Oakdale | 119 |
| Sonora | 69 |
| Escalon | 26 |
| Riverbank | 24 |
| Manteca | 22 |
| Stockton | 20 |
| Merced | 17 |
| Ripon | 17 |
| Jamestown | 13 |
| Atwater | 11 |
| Tracy | 10 |
| Los Banos | 7 |
| Valley Springs | 6 |
| Le Grand | 4 |
| Copperopolis | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| SOLAR INSTALLATION GROUP, INC. | 392 |
| SOLAR INSTALLATION GROUP | 25 |
| Solar Installation Group, Inc. | 14 |
| SOLAR INSTALLATION GROUP, INC | 9 |
| Solar Installation Group | 4 |
| SOLAR INSTALLATION GROUP INC | 2 |
| Solar Installation Group INC | 1 |
Common questions
Where does SOLAR INSTALLATION GROUP, INC. install solar?
Its installs are spread across 22 counties. The most are in Stanislaus County (141 installs), followed by San Joaquin County (109).
How often does SOLAR INSTALLATION GROUP, INC. install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many SOLAR INSTALLATION GROUP, INC. installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 447 interconnected installs with a tariff recorded (447) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.