Green Path Network

How many solar installs has Green Path Network done in California, and which license number is on its installs?

Green Path Network has 54 residential solar installs interconnected in California, active in the records from 2015 through 2019 (Oct 6, 2015 to Jan 24, 2019), most of them in Monterey County (9), Santa Clara County (9) and Orange County (7). The license number recorded on most of its installs, 1007695, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
0
Total capacity
196.7 kW DC
Median system size
3.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 6, 2015
Latest install
Jan 24, 2019
Counties
16
Utilities
PGE 40, SCE 13, SDGE 1
CSLB license
1007695

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
2016360
2017150
201810
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03870.4%not counted
NEM 2.01629.6%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Path Network’s installs. No residential system in the file lists a third-party owner name that matches Green Path Network exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 54 of Green Path Network’s 54 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 72.2%) used modules recorded as Canadian Solar.

Across all years, 54 of Green Path Network’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (54, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar039
SolarWorld014
Suniva01
Inverter makerEnphase054

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 54 installs, inverters on 54. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1007695Not found in the CSLB License Master file pulled Nov 4, 202653

License numbers are the ones the utilities recorded on the interconnection applications (53 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Monterey9
Santa Clara9
Orange7
Los Angeles5
Alameda4
Santa Cruz4
Contra Costa3
San Joaquin3
Kern2
Solano2
Merced1
San Diego1
San Luis Obispo1
San Mateo1
Ventura1
Yolo1

Top cities

CityInstalls
San Jose7
Salinas5
Bakersfield2
Buena Park2
Freedom2
Hayward2
Huntington Beach2
Lancaster2
Norwalk2
Seaside2
Watsonville2
Byron1
California Valley1
Daly City1
Diamond Bar1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Green Path Network30
Green Path Network, Inc19
GREEN PATH NETWORK2
GREEN PATH NETWORK, INC2
Green Path Network,Inc1

Common questions

Where does Green Path Network install solar?

Its installs are spread across 16 counties. The most are in Monterey County (9 installs), followed by Santa Clara County (9).

How often does Green Path Network install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Green Path Network installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.