Go Green Solar

How many solar installs has Go Green Solar done in California, and which license number is on its installs?

Go Green Solar has 114 residential solar installs interconnected in California, active in the records from 2010 through 2020 (May 14, 2010 to Feb 26, 2020), most of them in Los Angeles County (24), Riverside County (24) and San Bernardino County (15). The license number recorded on most of its installs, 972791, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
114
Last 24 months
0
Total capacity
804.3 kW DC
Median system size
6.6 kW DC
With battery storage
1.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 111 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 14, 2010
Latest install
Feb 26, 2020
Counties
18
Utilities
SCE 95, SDGE 10, PGE 9
CSLB license
972791

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201030
201100
201200
201300
201400
201520
2016340
2017500
2018180
201961
202011
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 114 interconnected installs with a tariff recorded (114) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07565.8%not counted
NEM 2.03934.2%2 (6.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Go Green Solar’s installs. No residential system in the file lists a third-party owner name that matches Go Green Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 109 of Go Green Solar’s 114 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (51, 46.8%) used modules recorded as Gigawatt.

Across all years, 113 of Go Green Solar’s 114 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (51, 45.1%) used inverters recorded as SolarEdge.

Across all years, 1 of Go Green Solar’s 114 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerGigawatt051
Sunspark Technology020
SolarWorld011
Thaisun Green Energy05
LG04
Inverter makerSolarEdge051
APsystems (Altenergy Power System)044
Enphase09
SMA07
ABB01
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 109 of 114 installs, inverters on 113. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
972791Not found in the CSLB License Master file pulled Nov 4, 2026102

License numbers are the ones the utilities recorded on the interconnection applications (107 of 114 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Go Green Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
unincorporated San Diego County972791123

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles24
Riverside24
San Bernardino15
Orange14
San Diego9
Ventura7
Kern5
Tulare4
Santa Barbara3
Contra Costa1
Lake1
Napa1
Nevada1
Placer1
San Joaquin1
Shasta1
Solano1
Yolo1

Top cities

CityInstalls
Long Beach7
Murrieta6
Moreno Valley4
Ridgecrest4
Apple Valley3
Chino3
Corona3
Riverside3
Whittier3
Beaumont2
Buena Park2
Desert Hot Springs2
Downey2
Hesperia2
Huntington Beach2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Go Green Solar110
Go Green Solar, Inc.3
GO GREEN SOLAR1

Common questions

Where does Go Green Solar install solar?

Its installs are spread across 18 counties. The most are in Los Angeles County (24 installs), followed by Riverside County (24).

How often does Go Green Solar install batteries with solar?

1.9% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Go Green Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 114 interconnected installs with a tariff recorded (114) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.