Gigawatt Inc.

How many solar installs has Gigawatt Inc. done in California, and which license number is on its installs?

Gigawatt Inc. has 111 residential solar installs interconnected in California, active in the records from 2012 through 2021 (Dec 24, 2012 to Jul 28, 2021), most of them in Los Angeles County (32), Orange County (25) and Kern County (16). The license number recorded on most of its installs, 972791, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
111
Last 24 months
0
Total capacity
816.7 kW DC
Median system size
7 kW DC
With battery storage
0.9% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Dec 24, 2012
Latest install
Jul 28, 2021
Counties
10
Utilities
SCE 109, PGE 2
CSLB license
972791

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201390
201450
201590
201600
2017111
2018270
2019390
202090
202110
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 111 interconnected installs with a tariff recorded (111) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03027.0%not counted
NEM 2.08173.0%1 (1.2%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Gigawatt Inc.’s installs. No residential system in the file lists a third-party owner name that matches Gigawatt Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 91 of Gigawatt Inc.’s 111 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (26, 28.6%) used modules recorded as United Renewable Energy.

Across all years, 111 of Gigawatt Inc.’s 111 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (53, 47.7%) used inverters recorded as SolarEdge.

Across all years, 1 of Gigawatt Inc.’s 111 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy026
Sunspark Technology017
Gigawatt016
LG012
JA Solar05
Inverter makerSolarEdge053
Enphase031
SMA017
APsystems (Altenergy Power System)04
Solis (Ginlong)03
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 91 of 111 installs, inverters on 111. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Gigawatt Inc. as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 40 kWh of storage. 1 have the status Paid, with $3,358 in current incentive allocations. Applications were received from Nov 20, 2017 to Jul 27, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$3,358
Cancelled132$6,368

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage240$9,7261$3,358

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
972791Not found in the CSLB License Master file pulled Nov 4, 2026108

License numbers are the ones the utilities recorded on the interconnection applications (109 of 111 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Gigawatt Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
unincorporated San Diego County972791123

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles32
Orange25
Kern16
San Bernardino15
Riverside12
Ventura5
Tulare3
Kings1
San Joaquin1
Solano1

Top cities

CityInstalls
Ridgecrest12
Yorba Linda6
Lancaster4
Orange3
Visalia3
Whittier3
Acton2
Corona2
Corona del Mar2
Fontana2
Fullerton2
Hesperia2
Huntington Beach2
Inyokern2
Long Beach2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GIGAWATT INC89
Gigawatt Inc.17
GIGAWATT3
Gigawatt Inc2

Common questions

Where does Gigawatt Inc. install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (32 installs), followed by Orange County (25).

How often does Gigawatt Inc. install batteries with solar?

0.9% of its interconnected solar installs include battery storage across all years.

How many Gigawatt Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 111 interconnected installs with a tariff recorded (111) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.