Evergreen

How many solar installs has Evergreen done in California, and which license number is on its installs?

Evergreen has 241 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Feb 9, 2018 to Apr 14, 2026), most of them in Placer County (46), Contra Costa County (44) and El Dorado County (44). CSLB lists license 730423 (EVERGREEN HOME PERFORMANCE LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
241
Last 24 months
25
Total capacity
2,013.8 kW DC
Median system size
7.5 kW DC
With battery storage
6.2% all time; 44.0% last 24 months
Third-party owned
0.0% of 241 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Mar 12, 2026
Ownership types recorded
none recorded
Median battery size
11.5 kWh (1 installs list a capacity)
First install
Feb 9, 2018
Latest install
Apr 14, 2026
Counties
20
Utilities
PGE 241
CSLB license
730423

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018410
2019310
2020200
2021430
2022272
2023412
2024193
2025157
2026 (through Aug 31, 2026)41

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 241 interconnected installs (5.8% of the 241 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The latest Net Billing Tariff install was approved Mar 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.4%not counted
NEM 2.022693.8%4 (1.8%)
Net Billing Tariff145.8%11 (78.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Evergreen’s installs. No residential system in the file lists a third-party owner name that matches Evergreen exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 22 of Evergreen’s 25 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10, 45.5%) used modules recorded as CertainTeed.

In the last 24 months, 25 of Evergreen’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 84.0%) used inverters recorded as Enphase.

In the last 24 months, 11 of Evergreen’s 25 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 63.6%) used batteries recorded as Tesla.

14 of 15 battery-paired PG&E and SCE installs (93.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed1034
Qcells693
Mission Solar3not in top list
JinkoSolar2not in top list
Canadian Solar1not in top list
Inverter makerEnphase21130
Tesla67
Power Center33
sonnen3not in top list
Fronius1not in top list
Battery makerTesla77
sonnen33
Enphase14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 229 of 241 installs, inverters on 241. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
730423EVERGREEN HOME PERFORMANCE LLC (Limited Liability)CLEARB General Building ContractorDec 11, 1996Jul 31, 2027239

License numbers are the ones the utilities recorded on the interconnection applications (241 of 241 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 730423. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer46
Contra Costa44
El Dorado44
Solano20
San Joaquin16
Sutter11
Yolo10
Sonoma9
Napa7
Alameda6
Amador6
Butte6
San Mateo5
Yuba3
Nevada2
Santa Clara2
Lake1
Mendocino1
Monterey1
Tuolumne1

Top cities

CityInstalls
Rocklin14
Placerville11
Yuba City11
El Dorado Hills9
Stockton9
Cameron Park8
Granite Bay8
Danville7
Lincoln7
Suisun City6
Vacaville6
Auburn5
Lafayette5
Napa5
Walnut Creek5

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EVERGREEN181
Evergreen60

Common questions

Where does Evergreen install solar?

Its installs are spread across 20 counties. The most are in Placer County (46 installs), followed by Contra Costa County (44).

How often does Evergreen install batteries with solar?

6.2% of its interconnected solar installs include battery storage across all years, and 44.0% in the last 24 months (11 of 25).

How many Evergreen installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 241 interconnected installs (5.8% of the 241 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.