Eagle Roofing Products

How many solar installs has Eagle Roofing Products done in California, and which license number is on its installs?

Eagle Roofing Products has 74 residential solar installs interconnected in California, active in the records from 2009 through 2013 (Mar 6, 2009 to Oct 9, 2013), most of them in San Diego County (17), Alameda County (16) and Yolo County (6). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
74
Last 24 months
0
Total capacity
287.7 kW DC
Median system size
2.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 6, 2009
Latest install
Oct 9, 2013
Counties
16
Utilities
PGE 47, SDGE 18, SCE 9
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
2009220
2010390
2011120
201200
201310
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 74 interconnected installs with a tariff recorded (74) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.074100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Eagle Roofing Products’s installs. No residential system in the file lists a third-party owner name that matches Eagle Roofing Products exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 56 of Eagle Roofing Products’ 74 installs name a module maker in the “Generator Manufacturer” fields, and most of those (46, 82.1%) used modules recorded as Suntech.

Across all years, 74 of Eagle Roofing Products’ 74 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (58, 78.4%) used inverters recorded as PV Powered.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSuntech046
Open Energy Corporation08
Canadian Solar02
Inverter makerPV Powered058
Open Energy Corporation09
Advanced Energy, Inc.05
Enphase01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 56 of 74 installs, inverters on 74. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 74 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Diego17
Alameda16
Yolo6
Kern5
Tulare5
Monterey4
Placer4
Contra Costa3
Fresno3
Orange3
El Dorado2
San Bernardino2
Colusa1
San Mateo1
Santa Barbara1
Santa Clara1

Top cities

CityInstalls
Pleasanton15
San Diego14
Bakersfield5
Tulare5
Woodland4
Clovis2
Davis2
La Jolla2
Lincoln2
Moraga2
Salinas2
Yorba Linda2
Carlsbad1
Chino1
Chino Hills1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Eagle Roofing Products65
EAGLE ROOFING PRODUCTS9

Common questions

Where does Eagle Roofing Products install solar?

Its installs are spread across 16 counties. The most are in San Diego County (17 installs), followed by Alameda County (16).

How often does Eagle Roofing Products install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Eagle Roofing Products installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 74 interconnected installs with a tariff recorded (74) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.