Beutler Corporation

How many solar installs has Beutler Corporation done in California, and which license number is on its installs?

Beutler Corporation has 132 residential solar installs interconnected in California, active in the records from 2008 through 2015 (May 14, 2008 to Apr 22, 2015), most of them in Placer County (64), El Dorado County (16) and Contra Costa County (11). CSLB lists license 162634 (VILLARA BUILDING SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, C-16, C-20, C-36, C-39, C-43, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
132
Last 24 months
0
Total capacity
657.6 kW DC
Median system size
4.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 131 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 14, 2008
Latest install
Apr 22, 2015
Counties
19
Utilities
PGE 131, SCE 1
CSLB license
162634

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200860
200990
201050
2011400
2012290
2013170
2014170
201590
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 132 interconnected installs with a tariff recorded (132) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0132100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Beutler Corporation’s installs. No residential system in the file lists a third-party owner name that matches Beutler Corporation exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 131 of Beutler Corporation’s 132 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (58, 44.3%) used modules recorded as Schuco USA LP.

Across all years, 132 of Beutler Corporation’s 132 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (61, 46.2%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSchuco USA LP058
SolarWorld028
Sharp025
SunPower011
Canadian Solar04
Inverter makerEnphase061
SMA051
SunPower010
Kaco05
Fronius03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 131 of 132 installs, inverters on 132. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
162634VILLARA BUILDING SYSTEMS (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical Contractor; C-16; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing Contractor; C-43Aug 15, 1956Oct 31, 202827

License numbers are the ones the utilities recorded on the interconnection applications (27 of 132 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 162634. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer64
El Dorado16
Contra Costa11
Yolo9
Sutter7
Solano4
Amador3
Calaveras3
Kern2
Napa2
Nevada2
San Joaquin2
Alameda1
Colusa1
Glenn1
San Bernardino1
San Francisco1
Stanislaus1
Yuba1

Top cities

CityInstalls
Rocklin18
Lincoln14
Granite Bay11
Loomis10
Auburn7
Concord7
El Dorado Hills6
Cameron Park5
Yuba City5
Davis4
Valley Springs3
Fairfield2
Live Oak2
Napa2
Newcastle2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Beutler Corporation122
Beutler Corp8
Beutler1
Beutler corp1

Common questions

Where does Beutler Corporation install solar?

Its installs are spread across 19 counties. The most are in Placer County (64 installs), followed by El Dorado County (16).

How often does Beutler Corporation install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Beutler Corporation installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 132 interconnected installs with a tariff recorded (132) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.