NB BAKER ELECTRIC INC
How many solar installs has NB BAKER ELECTRIC INC done in California, and which license number is on its installs?
NB BAKER ELECTRIC INC has 280 residential solar installs interconnected in California, active in the records from 2018 through 2023 (May 29, 2018 to Feb 22, 2023), most of them in Riverside County (235), Orange County (23) and San Bernardino County (16). CSLB lists license 858088 (BAKER HOME ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-39, C-46, expires Apr 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 280
- Last 24 months
- 0
- Total capacity
- 2,419.8 kW DC
- Median system size
- 8.3 kW DC
- With battery storage
- 15.4% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 1.8% of 280 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 1, lease 3, other 1
- Median battery size
- 13.5 kWh (43 installs list a capacity)
- First install
- May 29, 2018
- Latest install
- Feb 22, 2023
- Counties
- 4
- Utilities
- SCE 280
- CSLB license
- 858088
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 77 | 6 |
| 2019 | 86 | 12 |
| 2020 | 79 | 22 |
| 2021 | 36 | 3 |
| 2022 | 1 | 0 |
| 2023 | 1 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 280 interconnected installs with a tariff recorded (280) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 280 | 100.0% | 43 (15.4%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 5 of NB BAKER ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 3, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches NB BAKER ELECTRIC INC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Baker Electric Home Energy | 2 |
| Baker Electric | 1 |
| Baker Home Energy | 1 |
| Sunnova | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 280 of NB BAKER ELECTRIC INC’s 280 installs name a module maker in the “Generator Manufacturer” fields, and most of those (263, 93.9%) used modules recorded as LG.
Across all years, 280 of NB BAKER ELECTRIC INC’s 280 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (226, 80.7%) used inverters recorded as SolarEdge.
Across all years, 39 of NB BAKER ELECTRIC INC’s 280 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (36, 92.3%) used batteries recorded as Tesla.
39 of 43 battery-paired PG&E and SCE installs (90.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | LG | 0 | 263 |
| Panasonic | 0 | 12 | |
| Tesla | 0 | 4 | |
| Qcells | 0 | 2 | |
| REC | 0 | 2 | |
| Inverter maker | SolarEdge | 0 | 226 |
| Enphase | 0 | 32 | |
| SunPower | 0 | 14 | |
| Huawei Technologies Co., Ltd. | 0 | 3 | |
| LG | 0 | 3 | |
| Battery maker | Tesla | 0 | 36 |
| LG | 0 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 280 of 280 installs, inverters on 280. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names NB BAKER ELECTRIC INC as developer on 0 battery storage projects and as installer on 82 (0 name it as both), 82 projects in all with 1,842 kWh of storage. 72 have the status Paid, with $991,003 in current incentive allocations. Applications were received from Jun 5, 2017 to Oct 14, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 72 | 1,552 | $991,003 |
| Pending Reservation | 1 | 13 | $30,166 |
| Cancelled | 9 | 277 | $186,172 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 42 | 601 | $142,011 | 39 | $126,395 |
| Equity Resiliency | 34 | 1,030 | $990,005 | 30 | $834,408 |
| Large-Scale Storage | 5 | 198 | $45,159 | 3 | $30,200 |
| Residential Solar and Storage Equity - AB 209 | 1 | 13 | $30,166 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 858088 | BAKER HOME ENERGY (Corporation) | CLEAR | C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing Contractor; C-46 Solar Contractor | Apr 28, 2005 | Apr 30, 2027 | 280 |
License numbers are the ones the utilities recorded on the interconnection applications (280 of 280 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 858088. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list NB BAKER ELECTRIC INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| unincorporated San Diego County | 858088 | 492 | 605 | 389 | 404 | 556 | 556 | 194 | 209 | 90 | 3,495 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Baker Electric, Inc.: 21,299 installs, license 858088
- Baker Electric Home Energy: 537 installs, license 858088
- Baker Electric Solar: 431 installs, license 858088
- N B BAKER ELECTRIC INC: 170 installs, license 858088
- BAKER HOME ENERGY: 142 installs, license 858088
Counties
| County | Installs |
|---|---|
| Riverside | 235 |
| Orange | 23 |
| San Bernardino | 16 |
| Los Angeles | 6 |
Top cities
| City | Installs |
|---|---|
| Temecula | 62 |
| Murrieta | 59 |
| Winchester | 27 |
| Menifee | 20 |
| Hemet | 9 |
| Wildomar | 8 |
| Corona | 6 |
| Eastvale | 6 |
| Yucaipa | 6 |
| Lake Elsinore | 5 |
| Romoland | 5 |
| Beaumont | 4 |
| Riverside | 4 |
| Sun City | 4 |
| Claremont | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| NB BAKER ELECTRIC INC | 280 |
Common questions
Where does NB BAKER ELECTRIC INC install solar?
Its installs are spread across 4 counties. The most are in Riverside County (235 installs), followed by Orange County (23).
How often does NB BAKER ELECTRIC INC install batteries with solar?
15.4% of its interconnected solar installs include battery storage across all years.
How many NB BAKER ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 280 interconnected installs with a tariff recorded (280) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.