A & G ELECTRIC

How many solar installs has A & G ELECTRIC done in California, and which license number is on its installs?

A & G ELECTRIC has 57 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Mar 3, 2018 to Apr 23, 2026), most of them in Yolo County (38), Placer County (8) and El Dorado County (2). CSLB lists license 915693 (A & G ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
57
Last 24 months
3
Total capacity
534.4 kW DC
Median system size
8 kW DC
With battery storage
12.3% all time; 66.7% last 24 months
Third-party owned
0.0% of 57 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Apr 23, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (5 installs list a capacity)
First install
Mar 3, 2018
Latest install
Apr 23, 2026
Counties
11
Utilities
PGE 52, SCE 5
CSLB license
915693

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201840
201900
202040
202160
2022172
2023192
202441
202510
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 57 interconnected installs (3.5% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.8%not counted
NEM 2.05494.7%5 (9.3%)
Net Billing Tariff23.5%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on A & G ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches A & G ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of A & G ELECTRIC’s 3 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used modules recorded as Canadian Solar.

In the last 24 months, 3 of A & G ELECTRIC’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 33.3%) used inverters recorded as EG4.

In the last 24 months, 1 of A & G ELECTRIC’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

5 of 7 battery-paired PG&E and SCE installs (71.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar1not in top list
EG41not in top list
SunPower1not in top list
Znshine115
Inverter makerEG411
Enphase122
Tesla1not in top list
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 57 installs, inverters on 57. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
915693A & G ELECTRIC (Corporation)CLEARA General Engineering Contractor; C-10 Electrical ContractorMay 14, 2008Jan 31, 202853

License numbers are the ones the utilities recorded on the interconnection applications (57 of 57 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 915693. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Yolo38
Placer8
El Dorado2
Ventura2
Los Angeles1
San Bernardino1
San Joaquin1
Santa Cruz1
Solano1
Tulare1
Yuba1

Top cities

CityInstalls
West Sacramento37
Auburn3
Granite Bay2
Cameron Park1
Canyon Country1
Colfax1
Davis1
Meadow Vista1
Plumas Lake1
Rio Vista1
Rocklin1
Scotts Valley1
Shingle Springs1
Simi Valley1
Stockton1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A & G ELECTRIC48
A & G ELECTRIC COMPANY4
A&G Electric4
A&G ELECTRIC1

Common questions

Where does A & G ELECTRIC install solar?

Its installs are spread across 11 counties. The most are in Yolo County (38 installs), followed by Placer County (8).

How often does A & G ELECTRIC install batteries with solar?

12.3% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (2 of 3).

How many A & G ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 57 interconnected installs (3.5% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.