Unleash Solar

How many solar installs has Unleash Solar done in California, and which license number is on its installs?

Unleash Solar has 302 residential solar installs interconnected in California, active in the records from 2012 through 2017 (Jan 13, 2012 to Apr 24, 2017), most of them in San Bernardino County (63), Los Angeles County (55) and Riverside County (55). The license number recorded on most of its installs, 976594, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
302
Last 24 months
0
Total capacity
1,097.6 kW DC
Median system size
3.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
41.3% of 167 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 12, lease 55, prepaid lease 1, other 1
First install
Jan 13, 2012
Latest install
Apr 24, 2017
Counties
14
Utilities
SCE 223, SDGE 50, PGE 29
CSLB license
976594

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012430
20131100
2014530
2015930
201620
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 302 interconnected installs with a tariff recorded (302) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.030199.7%not counted
NEM 2.010.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 69 of Unleash Solar’s installs the utility recorded a third-party ownership type: PPA 12, lease 55, prepaid lease 1, other 1. No residential system in the file lists a third-party owner name that matches Unleash Solar exactly.

Third-party owner named on its installsInstalls
Kilowatt Systems LLC19
Greenday Finance LLC16
Sunnova Energy Corporation6
CLEAN POWER FINANCE5
Greenday Finance I LLC3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 149 of Unleash Solar’s 302 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (68, 45.6%) used modules recorded as Renesola America.

Across all years, 294 of Unleash Solar’s 302 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (68, 23.1%) used inverters recorded as ABB.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerRenesola America068
JinkoSolar049
Canadian Solar021
Astronergy (Chint)05
Trina Solar02
Inverter makerABB068
Enphase066
Kaco064
Growatt050
SMA024

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 149 of 302 installs, inverters on 294. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
976594Not found in the CSLB License Master file pulled Nov 4, 2026161

License numbers are the ones the utilities recorded on the interconnection applications (162 of 302 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Bernardino63
Los Angeles55
Riverside55
Orange49
San Diego43
Contra Costa11
Alameda7
Santa Clara6
Ventura5
Solano3
Kern2
San Joaquin1
San Mateo1
Tulare1

Top cities

CityInstalls
San Diego24
Apple Valley14
Hesperia11
Victorville10
Lake Elsinore7
Riverside7
Santa Ana7
Corona6
Palmdale6
Perris6
Wildomar6
Adelanto5
Fontana5
Pomona5
Hemet4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
UNLEASH SOLAR152
Unleash Solar150

Common questions

Where does Unleash Solar install solar?

Its installs are spread across 14 counties. The most are in San Bernardino County (63 installs), followed by Los Angeles County (55).

How often does Unleash Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Unleash Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 302 interconnected installs with a tariff recorded (302) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.