Synergy

How many solar installs has Synergy done in California, and which license number is on its installs?

Synergy has 45 residential solar installs interconnected in California, active in the records from 2014 through 2020 (Jun 2, 2014 to Mar 6, 2020), most of them in Placer County (7), San Joaquin County (7) and Fresno County (5). The license number recorded on most of its installs, 710225, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
45
Last 24 months
0
Total capacity
315.3 kW DC
Median system size
6.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
6.8% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 3
First install
Jun 2, 2014
Latest install
Mar 6, 2020
Counties
17
Utilities
PGE 44, SDGE 1
CSLB license
710225

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201420
201500
201610
201700
2018370
201940
202010
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 45 interconnected installs with a tariff recorded (45) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.036.7%not counted
NEM 2.04293.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of Synergy’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Synergy exactly.

Third-party owner named on its installsInstalls
Lifestyle2
HERO1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 42 of Synergy’s 45 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 21.4%) used modules recorded as Qcells.

Across all years, 45 of Synergy’s 45 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (36, 80.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells09
S-Energy09
Mission Solar07
Axitec06
Silfab04
Inverter makerSolarEdge036
Enphase07
Fronius01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 45 installs, inverters on 45. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
710225Not found in the CSLB License Master file pulled Nov 4, 202642

License numbers are the ones the utilities recorded on the interconnection applications (42 of 45 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Synergy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
unincorporated Marin County71022522

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Placer7
San Joaquin7
Fresno5
Contra Costa4
Yuba4
Butte2
El Dorado2
Lake2
Santa Clara2
Solano2
Sutter2
Amador1
Glenn1
Madera1
San Diego1
Stanislaus1
Yolo1

Top cities

CityInstalls
Lincoln4
Stockton3
Antioch2
Brentwood2
Clovis2
Kerman2
Lathrop2
Manteca2
Marysville2
San Jose2
Vacaville2
Yuba City2
Cameron Park1
Clearlake Oaks1
Coarsegold1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Synergy42
Synergy co1
Synergy Corp1
SYNERGY CORP1

Common questions

Where does Synergy install solar?

Its installs are spread across 17 counties. The most are in Placer County (7 installs), followed by San Joaquin County (7).

How often does Synergy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Synergy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 45 interconnected installs with a tariff recorded (45) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.