Sunlight Energy Inc

How many solar installs has Sunlight Energy Inc done in California, and which license number is on its installs?

Sunlight Energy Inc has 42 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Aug 23, 2016 to Feb 24, 2026), most of them in Sutter County (14), San Joaquin County (8) and Contra Costa County (3). CSLB lists license 1009178 (SUNLIGHT ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
9
Total capacity
326.8 kW DC
Median system size
7.2 kW DC
With battery storage
4.8% all time; 22.2% last 24 months
Third-party owned
0.0% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Feb 24, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Aug 23, 2016
Latest install
Feb 24, 2026
Counties
16
Utilities
PGE 39, SCE 3
CSLB license
1009178

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201700
201800
201980
202020
2021110
202200
202360
202481
202540
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 42 interconnected installs (14.3% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Feb 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.4%not counted
NEM 2.03583.3%0 (0.0%)
Net Billing Tariff614.3%2 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sunlight Energy Inc’s installs. No residential system in the file lists a third-party owner name that matches Sunlight Energy Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of Sunlight Energy Inc’s 9 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 44.4%) used modules recorded as Qcells.

In the last 24 months, 9 of Sunlight Energy Inc’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 2 of Sunlight Energy Inc’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells423
REC22
JA Solar1not in top list
Mission Solar1not in top list
SunPower1not in top list
Inverter makerEnphase614
Delta Electronics11
SunPower11
Tesla1not in top list
Battery makerEnphase11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009178SUNLIGHT ENERGY INC (Corporation)CLEARC-10 Electrical ContractorNov 23, 2015Nov 30, 202742

License numbers are the ones the utilities recorded on the interconnection applications (42 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1009178. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Sutter14
San Joaquin8
Contra Costa3
Solano3
Tulare2
Yuba2
Alameda1
El Dorado1
Lake1
Placer1
San Bernardino1
Santa Clara1
Sonoma1
Tehama1
Tuolumne1
Yolo1

Top cities

CityInstalls
Yuba City13
Lodi3
Lindsay2
Marysville2
Rio Vista2
San Pablo2
Tracy2
Acampo1
Apple Valley1
Auburn1
El Dorado Hills1
French Camp1
Groveland1
Hidden Valley Lake1
Nicolaus1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNLIGHT ENERGY INC33
Sunlight Energy Inc5
Sunlight Energy2
Sunlight Energy inc1
Sunlight Energy Inc.1

Common questions

Where does Sunlight Energy Inc install solar?

Its installs are spread across 16 counties. The most are in Sutter County (14 installs), followed by San Joaquin County (8).

How often does Sunlight Energy Inc install batteries with solar?

4.8% of its interconnected solar installs include battery storage across all years, and 22.2% in the last 24 months (2 of 9).

How many Sunlight Energy Inc installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 42 interconnected installs (14.3% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.