Solar Quote

How many solar installs has Solar Quote done in California, and which license number is on its installs?

Solar Quote has 101 residential solar installs interconnected in California, active in the records from 2018 through 2024 (Sep 4, 2018 to Jun 25, 2024), most of them in San Joaquin County (40), Contra Costa County (20) and Alameda County (12). CSLB lists license 941226 (TRUBLUE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
101
Last 24 months
0
Total capacity
655.3 kW DC
Median system size
6 kW DC
With battery storage
1.0% all time; no installs in the last 24 months last 24 months
Third-party owned
25.7% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 26
First install
Sep 4, 2018
Latest install
Jun 25, 2024
Counties
15
Utilities
PGE 101
CSLB license
941226

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018240
2019760
202000
202100
202200
202300
202411
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 101 interconnected installs with a tariff recorded (101) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0101100.0%1 (1.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 26 of Solar Quote’s installs the utility recorded a third-party ownership type: PPA 0, lease 26, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Solar Quote exactly.

Third-party owner named on its installsInstalls
SunPower26

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 98 of Solar Quote’s 101 installs name a module maker in the “Generator Manufacturer” fields, and most of those (97, 99.0%) used modules recorded as SunPower.

Across all years, 101 of Solar Quote’s 101 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (100, 99.0%) used inverters recorded as SunPower.

Across all years, 1 of Solar Quote’s 101 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower097
Qcells01
Inverter makerSunPower0100
Enphase01
SMA01
Tesla01
Battery makerTesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 98 of 101 installs, inverters on 101. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Quote as developer on 10 battery storage projects and as installer on 10 (10 name it as both), 10 projects in all with 244 kWh of storage. 3 have the status Paid, with $57,680 in current incentive allocations. Applications were received from Aug 29, 2023 to Mar 22, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid381$57,680
Reserved127$27,200
Cancelled6136$78,200

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency6149$148,8002$53,600
Small Residential Storage495$14,2801$4,080

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
941226TRUBLUE (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 21, 2009Dec 31, 2027100

License numbers are the ones the utilities recorded on the interconnection applications (101 of 101 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 941226. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Quote’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022Total
City and County of San Francisco941226729

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin40
Contra Costa20
Alameda12
Tuolumne6
Merced4
Calaveras3
Mariposa3
Stanislaus3
Amador2
San Benito2
Santa Clara2
Lake1
San Mateo1
Solano1
Sonoma1

Top cities

CityInstalls
Stockton15
Manteca11
Brentwood7
Livermore6
Tracy5
Escalon4
La Grange4
San Ramon4
Sonora4
Dublin3
Los Banos3
Newman3
Pleasanton3
Antioch2
Concord2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Quote100
solar quote1

Common questions

Where does Solar Quote install solar?

Its installs are spread across 15 counties. The most are in San Joaquin County (40 installs), followed by Contra Costa County (20).

How often does Solar Quote install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years.

How many Solar Quote installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 101 interconnected installs with a tariff recorded (101) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.