Rikety

How many solar installs has Rikety done in California, and which license number is on its installs?

Rikety has 97 residential solar installs interconnected in California, active in the records from 2018 through 2020 (Feb 18, 2018 to Jul 30, 2020), most of them in Alameda County (31), Contra Costa County (25) and San Joaquin County (23). CSLB lists license 941226 (TRUBLUE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
97
Last 24 months
0
Total capacity
679.8 kW DC
Median system size
6.7 kW DC
With battery storage
1.0% all time; no installs in the last 24 months last 24 months
Third-party owned
19.6% of 97 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 19
First install
Feb 18, 2018
Latest install
Jul 30, 2020
Counties
11
Utilities
PGE 97
CSLB license
941226

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018800
2019161
202010
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 97 interconnected installs with a tariff recorded (97) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.097100.0%1 (1.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 19 of Rikety’s installs the utility recorded a third-party ownership type: PPA 0, lease 19, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Rikety exactly.

Third-party owner named on its installsInstalls
SunPower18
SunPowe1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 93 of Rikety’s 97 installs name a module maker in the “Generator Manufacturer” fields, and most of those (79, 84.9%) used modules recorded as SunPower.

Across all years, 97 of Rikety’s 97 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (83, 85.6%) used inverters recorded as SunPower.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower079
LG011
Qcells02
Trina Solar01
Inverter makerSunPower083
Enphase012
SolarEdge03
Power-One01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 93 of 97 installs, inverters on 97. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
941226TRUBLUE (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 21, 2009Dec 31, 202792

License numbers are the ones the utilities recorded on the interconnection applications (97 of 97 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 941226. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Rikety’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022Total
City and County of San Francisco941226729

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda31
Contra Costa25
San Joaquin23
Calaveras5
Tuolumne5
Santa Clara3
Marin1
San Mateo1
Solano1
Stanislaus1
Yolo1

Top cities

CityInstalls
Livermore17
Stockton12
San Ramon6
Manteca4
Sonora4
Tracy4
Brentwood3
Martinez3
Pleasanton3
San Jose3
Concord2
Danville2
Dublin2
Hayward2
Oakland2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Rikety97

Common questions

Where does Rikety install solar?

Its installs are spread across 11 counties. The most are in Alameda County (31 installs), followed by Contra Costa County (25).

How often does Rikety install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years.

How many Rikety installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 97 interconnected installs with a tariff recorded (97) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.