Repower Livermore
How many solar installs has Repower Livermore done in California, and which license number is on its installs?
Repower Livermore has 110 residential solar installs interconnected in California, active in the records from 2016 through 2018 (Feb 18, 2016 to Aug 3, 2018), most of them in Alameda County (45), Contra Costa County (33) and San Joaquin County (19). CSLB lists license 941226 (TRUBLUE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 110
- Last 24 months
- 0
- Total capacity
- 721.4 kW DC
- Median system size
- 6.1 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 22.7% of 110 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- lease 5, prepaid lease 20
- First install
- Feb 18, 2016
- Latest install
- Aug 3, 2018
- Counties
- 7
- Utilities
- PGE 110
- CSLB license
- 941226
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2016 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2016 | 95 | 0 |
| 2017 | 14 | 0 |
| 2018 | 1 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 110 interconnected installs with a tariff recorded (110) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 95 | 86.4% | not counted |
| NEM 2.0 | 15 | 13.6% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 25 of Repower Livermore’s installs the utility recorded a third-party ownership type: PPA 0, lease 5, prepaid lease 20, other 0. No residential system in the file lists a third-party owner name that matches Repower Livermore exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sunrun | 24 |
| SunPower | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 105 of Repower Livermore’s 110 installs name a module maker in the “Generator Manufacturer” fields, and most of those (55, 52.4%) used modules recorded as LG.
Across all years, 110 of Repower Livermore’s 110 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (83, 75.5%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | LG | 0 | 55 |
| Hyundai | 0 | 23 | |
| REC | 0 | 9 | |
| SolarWorld | 0 | 9 | |
| SunPower | 0 | 3 | |
| Inverter maker | Enphase | 0 | 83 |
| SMA | 0 | 20 | |
| SunPower | 0 | 4 | |
| SolarEdge | 0 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 105 of 110 installs, inverters on 110. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 941226 | TRUBLUE (Corporation) | CLEAR | B General Building Contractor; C-46 Solar Contractor | Dec 21, 2009 | Dec 31, 2027 | 110 |
License numbers are the ones the utilities recorded on the interconnection applications (110 of 110 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 941226. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Repower Livermore’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2021 | 2022 | Total |
|---|---|---|---|---|
| City and County of San Francisco | 941226 | 7 | 2 | 9 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Solar Universe: 1,749 installs, license 941226
- Solar Universe - Brentwood: 288 installs, license 941226
- Repower: 109 installs, license 941226
- Solar Quote: 101 installs, license 941226
- Rikety: 97 installs, license 941226
- Solar Network, Inc. DBA Solar Universe: 90 installs, license 941226
- Solar SGV Inc.: 51 installs, license 941226
Counties
| County | Installs |
|---|---|
| Alameda | 45 |
| Contra Costa | 33 |
| San Joaquin | 19 |
| Monterey | 6 |
| Santa Clara | 4 |
| Solano | 2 |
| Merced | 1 |
Top cities
| City | Installs |
|---|---|
| Livermore | 29 |
| Tracy | 11 |
| Danville | 8 |
| Pleasanton | 7 |
| San Ramon | 7 |
| Salinas | 4 |
| Stockton | 4 |
| Berkeley | 3 |
| Brentwood | 3 |
| Concord | 3 |
| Dublin | 3 |
| Alamo | 2 |
| Antioch | 2 |
| Byron | 2 |
| King City | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Repower Livermore | 95 |
| RePower Livermore | 15 |
Common questions
Where does Repower Livermore install solar?
Its installs are spread across 7 counties. The most are in Alameda County (45 installs), followed by Contra Costa County (33).
How often does Repower Livermore install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Repower Livermore installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 110 interconnected installs with a tariff recorded (110) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.