How many solar installs has SOLAR GOING UP done in California, and which license number is on its installs?

SOLAR GOING UP has 121 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jul 7, 2021 to Apr 13, 2026), most of them in Riverside County (64), Orange County (14) and San Bernardino County (12). The license number recorded on most of its installs, 1068901, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
121
Last 24 months
9
Total capacity
1,121.4 kW DC
Median system size
8.1 kW DC
With battery storage
5.0% all time; 22.2% last 24 months
Third-party owned
0.8% of 121 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Jun 16, 2025
Ownership types recorded
other 1
Median battery size
10.5 kWh (3 installs list a capacity)
First install
Jul 7, 2021
Latest install
Apr 13, 2026
Counties
13
Utilities
SCE 106, PGE 15
CSLB license
1068901

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021190
2022350
2023471
2024144
202551
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 121 interconnected installs (6.6% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The latest Net Billing Tariff install was approved Jun 16, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011393.4%1 (0.9%)
Net Billing Tariff86.6%5 (62.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of SOLAR GOING UP’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches SOLAR GOING UP exactly.

Third-party owner named on its installsInstalls
David Ley1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of SOLAR GOING UP’s 9 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 44.4%) used modules recorded as Canadian Solar.

In the last 24 months, 9 of SOLAR GOING UP’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 77.8%) used inverters recorded as SMA.

In the last 24 months, 2 of SOLAR GOING UP’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

6 of 6 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar440
Qcells227
Aptos Solar1not in top list
Hanwa1not in top list
REC1not in top list
Inverter makerSMA79
Enphase255
Battery makerEnphase14
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 115 of 121 installs, inverters on 121. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1068901Not found in the CSLB License Master file pulled Nov 4, 2026120

License numbers are the ones the utilities recorded on the interconnection applications (120 of 121 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SOLAR GOING UP’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021202220232026Total
unincorporated San Diego County1068901249217

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside64
Orange14
San Bernardino12
Los Angeles11
Santa Clara6
Kern3
Ventura3
Alameda2
Nevada2
Marin1
San Francisco1
San Joaquin1
Sonoma1

Top cities

CityInstalls
Palm Springs10
Murrieta7
Canyon Lake6
Corona5
Lake Elsinore4
Menifee4
San Jose4
Indian Wells3
Placentia3
Temecula3
Alta Loma2
Calabasas2
Cathedral City2
Cypress2
Grass Valley2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR GOING UP121

Common questions

Where does SOLAR GOING UP install solar?

Its installs are spread across 13 counties. The most are in Riverside County (64 installs), followed by Orange County (14).

How often does SOLAR GOING UP install batteries with solar?

5.0% of its interconnected solar installs include battery storage across all years, and 22.2% in the last 24 months (2 of 9).

How many SOLAR GOING UP installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 121 interconnected installs (6.6% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.