POWERAID has 36 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Nov 12, 2025 to Aug 24, 2026), most of them in Los Angeles County (9), Riverside County (6) and San Bernardino County (5). CSLB lists license 978758 (POWERAID) with status Work Comp Susp in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
36
Last 24 months
36
Total capacity
284.2 kW DC
Median system size
7.1 kW DC
With battery storage
36.1% all time; 36.1% last 24 months
Third-party owned
0.0% of 36 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
36 installs, latest Aug 24, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (13 installs list a capacity)
First install
Nov 12, 2025
Latest install
Aug 24, 2026
Counties
13
Utilities
SCE 27, PGE 9
CSLB license
978758

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
202532
2026 (through Aug 31, 2026)3311

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

36 of its 36 interconnected installs (100.0% of the 36 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 36.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff36100.0%13 (36.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on POWERAID’s installs. No residential system in the file lists a third-party owner name that matches POWERAID exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 36 of POWERAID’s 36 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 25.0%) used modules recorded as Canadian Solar.

In the last 24 months, 36 of POWERAID’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (17, 47.2%) used inverters recorded as Enphase.

In the last 24 months, 8 of POWERAID’s 36 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (2, 25.0%) used batteries recorded as Enphase.

8 of 13 battery-paired PG&E and SCE installs (61.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar99
JinkoSolar99
Qcells55
Tigo Energy, Inc44
REC33
Inverter makerEnphase1717
SolarEdge1111
Tigo Energy, Inc55
Tesla22
Fronius11
Battery makerEnphase22
SolarEdge22
Tesla22
FranklinWH11
LG11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 36 of 36 installs, inverters on 36. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
978758POWERAID (Corporation)Work Comp SuspC-10 Electrical Contractor; C-46 Solar ContractorNov 16, 2012Nov 30, 202636

License numbers are the ones the utilities recorded on the interconnection applications (36 of 36 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 978758. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list POWERAID’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242026Total
City and County of San Francisco978758426
unincorporated San Diego County978758707

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles9
Riverside6
San Bernardino5
Fresno4
Orange3
Ventura2
Kern1
Madera1
Merced1
San Luis Obispo1
Solano1
Tulare1
Tuolumne1

Top cities

CityInstalls
Fresno3
Moreno Valley3
Fontana2
Santa Fe Springs2
Apple Valley1
Atascadero1
Camarillo1
Chino Hills1
Clovis1
Delano1
Desert Hot Springs1
Hacienda Heights1
Hawthorne1
Irvine1
La Grange1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
POWERAID36

Common questions

Where does POWERAID install solar?

Its installs are spread across 13 counties. The most are in Los Angeles County (9 installs), followed by Riverside County (6).

How often does POWERAID install batteries with solar?

36.1% of its interconnected solar installs include battery storage across all years, and 36.1% in the last 24 months (13 of 36).

How many POWERAID installs are under NEM 3.0 (the Net Billing Tariff)?

36 of its 36 interconnected installs (100.0% of the 36 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 36.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.