Katalyst Construction

How many solar installs has Katalyst Construction done in California, and which license number is on its installs?

Katalyst Construction has 65 residential solar installs interconnected in California, active in the records from 2009 through 2023 (Aug 19, 2009 to Dec 20, 2023), most of them in Placer County (21), Santa Clara County (7) and Contra Costa County (5). The license number recorded on most of its installs, 932394, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
65
Last 24 months
0
Total capacity
512.1 kW DC
Median system size
6.6 kW DC
With battery storage
1.5% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 65 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 19, 2009
Latest install
Dec 20, 2023
Counties
20
Utilities
PGE 65
CSLB license
932394

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201010
201150
201250
201320
201480
2015140
201650
201720
201850
201970
202040
202121
202220
202320
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04163.1%not counted
NEM 2.02436.9%1 (4.2%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Katalyst Construction’s installs. No residential system in the file lists a third-party owner name that matches Katalyst Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 63 of Katalyst Construction’s 65 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 27.0%) used modules recorded as SolarWorld.

Across all years, 65 of Katalyst Construction’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (56, 86.2%) used inverters recorded as SolarEdge.

Across all years, 1 of Katalyst Construction’s 65 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld017
Canadian Solar08
LONGi07
Mission Solar07
Sunpreme05
Inverter makerSolarEdge056
SMA011
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 63 of 65 installs, inverters on 65. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Katalyst Construction as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 8 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from May 20, 2022 to May 20, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled18$1,259

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18$1,2590$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
932394Not found in the CSLB License Master file pulled Nov 4, 202645

License numbers are the ones the utilities recorded on the interconnection applications (47 of 65 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Placer21
Santa Clara7
Contra Costa5
El Dorado5
Alameda4
San Mateo3
Solano3
Sonoma3
Napa2
San Joaquin2
Amador1
Butte1
Fresno1
Marin1
Merced1
Monterey1
Nevada1
Santa Cruz1
Shasta1
Tehama1

Top cities

CityInstalls
Auburn8
Loomis4
Placerville4
Vacaville3
Angwin2
Colfax2
Gilroy2
Morgan Hill2
Oakland2
Rocklin2
Tracy2
Alamo1
Anderson1
Belmont1
Berkeley1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Katalyst Construction53
KATALYST CONSTRUCTION10
katalyst Construction2

Common questions

Where does Katalyst Construction install solar?

Its installs are spread across 20 counties. The most are in Placer County (21 installs), followed by Santa Clara County (7).

How often does Katalyst Construction install batteries with solar?

1.5% of its interconnected solar installs include battery storage across all years.

How many Katalyst Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 65 interconnected installs with a tariff recorded (65) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.