Jovic Construction

How many solar installs has Jovic Construction done in California, and which license number is on its installs?

Jovic Construction has 121 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Dec 26, 2017 to Aug 20, 2026), most of them in Los Angeles County (34), San Diego County (25) and San Bernardino County (23). CSLB lists license 874560 (JOVIC CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
121
Last 24 months
15
Total capacity
958.6 kW DC
Median system size
7.2 kW DC
With battery storage
9.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 77.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 121 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Aug 20, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (9 installs list a capacity)
First install
Dec 26, 2017
Latest install
Aug 20, 2026
Counties
11
Utilities
SCE 84, SDGE 27, PGE 10
CSLB license
874560

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
201870
201930
2020110
202190
2022160
2023481
2024121
202553
2026 (through Aug 31, 2026)84

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 121 interconnected installs (13.2% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010586.8%1 (1.2%)
Net Billing Tariff1613.2%8 (72.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Jovic Construction’s installs. No residential system in the file lists a third-party owner name that matches Jovic Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of Jovic Construction’s 15 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 40.0%) used modules recorded as Canadian Solar.

In the last 24 months, 15 of Jovic Construction’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 93.3%) used inverters recorded as Enphase.

In the last 24 months, 7 of Jovic Construction’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 85.7%) used batteries recorded as Enphase.

9 of 9 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar617
Aptos Solar369
SolarEver Technologia2not in top list
Sonali Energees USA LLC2not in top list
EMMVEE Photovoltaic Power1not in top list
Inverter makerEnphase1487
APsystems (Altenergy Power System)1not in top list
Battery makerEnphase68
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 121 of 121 installs, inverters on 121. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
874560JOVIC CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorMar 18, 2006Sep 30, 2027121

License numbers are the ones the utilities recorded on the interconnection applications (121 of 121 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 874560. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Jovic Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
unincorporated San Diego County87456011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles34
San Diego25
San Bernardino23
Santa Barbara10
Ventura8
Orange7
San Luis Obispo7
Contra Costa2
Riverside2
Tulare2
Kern1

Top cities

CityInstalls
Cardiff12
Santa Barbara9
Agoura Hills8
Alta Loma6
Fontana5
Encinitas4
Thousand Oaks4
Diamond Bar3
Yucaipa3
Calabasas2
Cerritos2
La Verne2
Long Beach2
Paso Robles2
San Diego2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
JOVIC CONSTRUCTION81
Jovic Construction28
JOVIC CONSTRUCTION INC12

Common questions

Where does Jovic Construction install solar?

Its installs are spread across 11 counties. The most are in Los Angeles County (34 installs), followed by San Diego County (25).

How often does Jovic Construction install batteries with solar?

9.6% of its interconnected solar installs include battery storage across all years, and 77.8% in the last 24 months (7 of 9). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Jovic Construction installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 121 interconnected installs (13.2% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.