Green Convergence

How many solar installs has Green Convergence done in California, and which license number is on its installs?

Green Convergence has 2,589 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Jul 30, 2009 to Aug 14, 2026), most of them in Los Angeles County (1,801), Ventura County (406) and Fresno County (327). CSLB lists license 927678 (GREEN CONVERGENCE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,589
Last 24 months
184
Total capacity
20,282.5 kW DC
Median system size
7 kW DC
With battery storage
17.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
8.2% of 2,411 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
172 installs, latest Jul 24, 2026
Ownership types recorded
PPA 2, lease 192, prepaid lease 2, other 2
Median battery size
13.5 kWh (449 installs list a capacity)
First install
Jul 30, 2009
Latest install
Aug 14, 2026
Counties
11
Utilities
SCE 2,253, PGE 331, SDGE 5
CSLB license
927678

Is Green Convergence still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (96 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200970
2010210
2011180
2012800
2013980
20141040
20151680
20161460
20171861
20182009
201914617
202014134
202122143
202237160
202339578
202412968
2025118113
2026 (through Aug 31, 2026)4035

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

172 of its 2,589 interconnected installs (6.6% of the 2,589 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.8% of those include battery storage. The latest Net Billing Tariff install was approved Jul 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.075829.3%not counted
NEM 2.01,65964.1%293 (17.7%)
Net Billing Tariff1726.6%163 (94.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 198 of Green Convergence’s installs the utility recorded a third-party ownership type: PPA 2, lease 192, prepaid lease 2, other 2. Across all installers, 4 residential systems list a third-party owner name that matches Green Convergence exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital, LLC96
SunPower Solar Program I, LLC84
SunPower Corporation7
GREEN CONVERGENCE4
SunPower Capital, LLC C/O Residential Leasing4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 182 of Green Convergence’s 184 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (86, 47.3%) used modules recorded as REC.

In the last 24 months, 183 of Green Convergence’s 184 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (84, 45.9%) used inverters recorded as Tesla.

In the last 24 months, 148 of Green Convergence’s 184 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (114, 77.0%) used batteries recorded as Tesla.

402 of 458 battery-paired PG&E and SCE installs (87.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC8686
SunPower591,576
Panasonic2031
Qcells7not in top list
Silfab6not in top list
Inverter makerTesla84111
Enphase36656
SunPower32931
Panasonic18not in top list
SolarEdge7440
Battery makerTesla114217
FranklinWH2020
EcoFlow44
Enphase3not in top list
SunPower3122

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,130 of 2,589 installs, inverters on 2,588. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Green Convergence as developer on 658 battery storage projects and as installer on 1,039 (656 name it as both), 1,041 projects in all with 22,998 kWh of storage. 485 have the status Paid, with $3,250,809 in current incentive allocations. Applications were received from May 1, 2017 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4858,953$3,250,809
PBI in Process140$39,600
Reserved213,044$165,934
Cancelled1573,432$1,069,533
RRF Rejected3777,529$1,504,027

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage4998,215$1,493,000379$1,102,984
Equity Resiliency1035,191$2,550,89576$1,908,328
Large-Scale Storage622,064$481,98230$239,497
Not stated3777,529$1,504,0270$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
927678GREEN CONVERGENCE (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorJan 21, 2009Jan 31, 20272,583

License numbers are the ones the utilities recorded on the interconnection applications (2,585 of 2,589 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 927678. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Green Convergence’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2026Total
unincorporated San Diego County92767811

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles1,801
Ventura406
Fresno327
Orange24
Kern12
San Bernardino6
Riverside5
San Diego4
San Francisco2
Madera1
Santa Barbara1

Top cities

CityInstalls
Fresno327
Valencia323
Santa Clarita307
Canyon Country141
Saugus132
Castaic122
Simi Valley103
Thousand Oaks95
Newhall94
Stevenson Ranch78
Lancaster49
Agoura Hills45
Palmdale45
Camarillo42
Newbury Park42

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN CONVERGENCE2,225
Green Convergence363
Green Convergence.1

Common questions

Where does Green Convergence install solar?

Its installs are spread across 11 counties. The most are in Los Angeles County (1,801 installs), followed by Ventura County (406).

How often does Green Convergence install batteries with solar?

17.7% of its interconnected solar installs include battery storage across all years, and 92.9% in the last 24 months (170 of 183). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Green Convergence installs are under NEM 3.0 (the Net Billing Tariff)?

172 of its 2,589 interconnected installs (6.6% of the 2,589 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.