Electricare, Inc.

How many solar installs has Electricare, Inc. done in California, and which license number is on its installs?

Electricare, Inc. has 895 residential solar installs interconnected in California, active in the records from 2004 through 2026 (Jul 8, 2004 to Jun 30, 2026), most of them in Riverside County (400), Orange County (142) and San Bernardino County (138). CSLB lists license 778366 (ELECTRICARE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
895
Last 24 months
17
Total capacity
6,215.3 kW DC
Median system size
6 kW DC
With battery storage
6.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 75.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
22.9% of 725 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
14 installs, latest Jun 30, 2026
Ownership types recorded
PPA 47, lease 108, other 11
Median battery size
14.4 kWh (54 installs list a capacity)
First install
Jul 8, 2004
Latest install
Jun 30, 2026
Counties
7
Utilities
SCE 781, SDGE 113, PGE 1
CSLB license
778366

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200420
200570
2006130
200790
2008240
2009300
2010140
201190
2012640
20131050
20141050
2015850
2016470
2017210
2018270
2019370
2020441
2021618
20227715
20238215
2024164
2025118
2026 (through Aug 31, 2026)53

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

14 of its 895 interconnected installs (1.6% of the 895 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 30, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.052458.5%not counted
NEM 2.035739.9%43 (14.5%)
Net Billing Tariff141.6%11 (84.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 166 of Electricare, Inc.’s installs the utility recorded a third-party ownership type: PPA 47, lease 108, prepaid lease 0, other 11. Across all installers, 7 residential systems list a third-party owner name that matches Electricare, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Kilowatt Systems, LLC32
NRG SunCap LLC28
MYSOLAR I, LLC21
SunPower Capital, LLC.19
Killowatt Systems LLC.12

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of Electricare, Inc.’s 17 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9, 52.9%) used modules recorded as SunPower.

In the last 24 months, 17 of Electricare, Inc.’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 47.1%) used inverters recorded as Tesla.

In the last 24 months, 10 of Electricare, Inc.’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 60.0%) used batteries recorded as Tesla.

42 of 54 battery-paired PG&E and SCE installs (77.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower977
REC451
Qcells343
Foxess1not in top list
Hyundai1not in top list
Inverter makerTesla8not in top list
Enphase6313
SolarEdge2171
Foxess1not in top list
SunPower1100
Battery makerTesla66
Enphase22
FranklinWH1not in top list
LG110

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 497 of 895 installs, inverters on 891. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Electricare, Inc. as developer on 9 battery storage projects and as installer on 9 (9 name it as both), 9 projects in all with 157 kWh of storage. 1 have the status Paid, with $13,320 in current incentive allocations. Applications were received from Sep 8, 2021 to Jul 31, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid117$13,320
Cancelled8140$91,417

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency8143$102,6201$13,320
Small Residential Storage114$2,1170$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
778366ELECTRICARE INC (Corporation)CLEARC-10 Electrical ContractorMay 5, 2000Mar 31, 2027840

License numbers are the ones the utilities recorded on the interconnection applications (842 of 895 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 778366. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Electricare, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920212025Total
unincorporated San Diego County778366464115

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside400
Orange142
San Bernardino138
Los Angeles111
San Diego95
Ventura8
Kern1

Top cities

CityInstalls
Temecula59
Murrieta46
Corona40
Menifee31
San Diego31
Lake Elsinore25
Redlands25
Hemet21
Palm Desert18
Riverside17
Winchester16
Moreno Valley15
Wildomar15
Chino13
Yucaipa13

Names as recorded by the utilities

The utilities recorded this installer under 14 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELECTRICARE INC374
Electricare, Inc.208
Electricare Inc115
ELECTRICARE86
Electricare Inc.52
ElectriCare Inc.23
ElectriCare10
ElectriCare, Inc.10
ElectriCare Inc9
Electricare4
Electricare inc.1
ElectriCare inc.1
ELECTRICARE-INC1
ElectriCare, inc.1

Common questions

Where does Electricare, Inc. install solar?

Its installs are spread across 7 counties. The most are in Riverside County (400 installs), followed by Orange County (142).

How often does Electricare, Inc. install batteries with solar?

6.9% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (12 of 16). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Electricare, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

14 of its 895 interconnected installs (1.6% of the 895 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.