ELECTRIC REVOLUTION

How many solar installs has ELECTRIC REVOLUTION done in California, and which license number is on its installs?

ELECTRIC REVOLUTION has 165 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 10, 2019 to Jul 17, 2026), most of them in El Dorado County (69), Placer County (65) and Nevada County (9). CSLB lists license 1036037 (ELECTRIC REVOLUTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
165
Last 24 months
14
Total capacity
1,400.2 kW DC
Median system size
7.5 kW DC
With battery storage
6.7% all time; 28.6% last 24 months
Third-party owned
0.0% of 165 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest Jul 17, 2026
Ownership types recorded
none recorded
First install
Oct 10, 2019
Latest install
Jul 17, 2026
Counties
12
Utilities
PGE 165
CSLB license
1036037

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201950
2020260
2021281
2022321
2023503
2024124
202571
2026 (through Aug 31, 2026)51

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 165 interconnected installs (16.4% of the 165 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 29.6% of those include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.013883.6%3 (2.2%)
Net Billing Tariff2716.4%8 (29.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ELECTRIC REVOLUTION’s installs. No residential system in the file lists a third-party owner name that matches ELECTRIC REVOLUTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of ELECTRIC REVOLUTION’s 14 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 100.0%) used modules recorded as Qcells.

In the last 24 months, 14 of ELECTRIC REVOLUTION’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 4 of ELECTRIC REVOLUTION’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as Enphase.

11 of 11 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells13146
Inverter makerEnphase14162
SunPower11
Battery makerEnphase411

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 159 of 165 installs, inverters on 165. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1036037ELECTRIC REVOLUTION (Corporation)CLEARC-46 Solar ContractorFeb 20, 2018Feb 29, 2028165

License numbers are the ones the utilities recorded on the interconnection applications (165 of 165 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1036037. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
El Dorado69
Placer65
Nevada9
Yolo9
Amador5
Yuba2
Alameda1
Contra Costa1
Sacramento1
San Joaquin1
Sonoma1
Sutter1

Top cities

CityInstalls
El Dorado Hills40
Lincoln16
Granite Bay13
Auburn12
Rocklin10
Meadow Vista9
Cameron Park8
Placerville8
Grass Valley6
West Sacramento6
Shingle Springs4
Loomis3
Coloma2
Davis2
Newcastle2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELECTRIC REVOLUTION164
Electric Revolution1

Common questions

Where does ELECTRIC REVOLUTION install solar?

Its installs are spread across 12 counties. The most are in El Dorado County (69 installs), followed by Placer County (65).

How often does ELECTRIC REVOLUTION install batteries with solar?

6.7% of its interconnected solar installs include battery storage across all years, and 28.6% in the last 24 months (4 of 14).

How many ELECTRIC REVOLUTION installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 165 interconnected installs (16.4% of the 165 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 29.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.