EFFICIENT ENERGY SOLUTIONS

How many solar installs has EFFICIENT ENERGY SOLUTIONS done in California, and which license number is on its installs?

EFFICIENT ENERGY SOLUTIONS has 73 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Jun 18, 2014 to Jun 29, 2025), most of them in Sonoma County (16), Marin County (6) and Contra Costa County (5). CSLB lists license 365598 (EFFICIENT ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, C-10, C-17, C-20, C-36, C-54, D-41, D-65, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to EFFICIENT ENERGY SOLUTIONS here carry more than one CSLB license number: 365598 on 40 (CSLB holder EFFICIENT ENERGY SOLUTIONS INC, Sacramento) and 993995 on 30 (CSLB holder EFFICIENT ENERGY SOLUTIONS, Rio Vista), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
73
Last 24 months
3
Total capacity
472.2 kW DC
Median system size
5.7 kW DC
With battery storage
13.7% all time; 33.3% last 24 months
Third-party owned
0.0% of 73 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Sep 4, 2024
Ownership types recorded
none recorded
Median battery size
9.3 kWh (7 installs list a capacity)
First install
Jun 18, 2014
Latest install
Jun 29, 2025
Counties
20
Utilities
PGE 73
CSLB license
365598, 993995

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014140
201500
201600
201700
201800
201910
202082
2021302
202283
202382
202430
202511
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 73 interconnected installs (5.5% of the 73 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Sep 4, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01419.2%not counted
NEM 2.05575.3%8 (14.5%)
Net Billing Tariff45.5%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on EFFICIENT ENERGY SOLUTIONS’s installs. No residential system in the file lists a third-party owner name that matches EFFICIENT ENERGY SOLUTIONS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of EFFICIENT ENERGY SOLUTIONS’ 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Silfab.

In the last 24 months, 3 of EFFICIENT ENERGY SOLUTIONS’ 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as SolarEdge.

In the last 24 months, none of EFFICIENT ENERGY SOLUTIONS’ 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

8 of 10 battery-paired PG&E and SCE installs (80.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab215
Inverter makerSolarEdge231
Enphase141
Battery makerLG07
Eguana Technologies Inc.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 66 of 73 installs, inverters on 73. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
365598EFFICIENT ENERGY SOLUTIONS INC (Corporation)CLEARB General Building Contractor; C-2; C-10 Electrical Contractor; C-17; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-54; D-41; D-65Nov 1, 1978Jan 31, 202840
993995EFFICIENT ENERGY SOLUTIONS (Corporation)CLEARC-10 Electrical ContractorJun 25, 2014Jun 30, 202830

License numbers are the ones the utilities recorded on the interconnection applications (72 of 73 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 365598, 993995. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list EFFICIENT ENERGY SOLUTIONS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated Marin County36559811

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma16
Marin6
Contra Costa5
Solano5
Sutter5
Napa4
Yolo4
Alameda3
Nevada3
San Joaquin3
Tehama3
Amador2
Butte2
Calaveras2
Colusa2
Placer2
Shasta2
Yuba2
Mendocino1
Merced1

Top cities

CityInstalls
Santa Rosa5
Yuba City5
American Canyon3
Cotati3
Point Reyes Station3
Rio Vista3
Grass Valley2
Novato2
Oakland2
Oroville2
Penngrove2
Petaluma2
Rohnert Park2
West Sacramento2
Anderson1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EFFICIENT ENERGY SOLUTIONS31
EFFICIENT ENERGY SOLUTIONS INC29
Efficient Energy Solutions, Inc5
Efficient Energy Solutions, Inc.3
Efficient Energy Solutions2
Efficient Energy Solutions, INC1
EFFICIENT ENERGY SOLUTIONS, INC1
Efficient Energy Solutions, INC.1

Common questions

Where does EFFICIENT ENERGY SOLUTIONS install solar?

Its installs are spread across 20 counties. The most are in Sonoma County (16 installs), followed by Marin County (6).

How often does EFFICIENT ENERGY SOLUTIONS install batteries with solar?

13.7% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (1 of 3).

How many EFFICIENT ENERGY SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 73 interconnected installs (5.5% of the 73 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.