Staten Solar has 54 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Aug 1, 2013 to Apr 16, 2026), most of them in Alameda County (19), Kern County (12) and Santa Clara County (11). CSLB lists license 984910 (STATEN SOLAR CORPORATION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
2
Total capacity
580.5 kW DC
Median system size
8.4 kW DC
With battery storage
16.7% all time; 0.0% last 24 months
Third-party owned
7.4% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Dec 20, 2023
Ownership types recorded
lease 4
Median battery size
18.9 kWh (5 installs list a capacity)
First install
Aug 1, 2013
Latest install
Apr 16, 2026
Counties
12
Utilities
PGE 51, SCE 3
CSLB license
984910

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201420
201570
201680
201720
201800
201910
202082
2021102
202252
202372
202421
202500
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 54 interconnected installs (1.9% of the 54 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 20, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01833.3%not counted
NEM 2.03564.8%9 (25.7%)
Net Billing Tariff11.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 4 of Staten Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 4, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Staten Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower3
Staten Solar Corp1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Staten Solar’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Mission Solar.

In the last 24 months, 2 of Staten Solar’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 50.0%) used inverters recorded as Enphase.

In the last 24 months, none of Staten Solar’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

5 of 9 battery-paired PG&E and SCE installs (55.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar1not in top list
Suzhou Talesun Solar Technologies1not in top list
Inverter makerEnphase13
SolarEdge114
Battery makerLG04
Qcells01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 52 of 54 installs, inverters on 54. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Staten Solar as developer on 12 battery storage projects and as installer on 12 (10 name it as both), 14 projects in all with 948 kWh of storage. 8 have the status Paid, with $93,048 in current incentive allocations. Applications were received from May 15, 2020 to Feb 26, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8201$93,048
Pending Reservation1324$80,871
Cancelled4407$333,056
RRF Rejected116$3,138

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage577$13,3534$10,737
Large-Scale Storage4410$97,7472$11,762
Equity Resiliency3121$120,9132$70,549
Non-Residential Storage Equity1324$274,9610$0
Not stated116$3,1380$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
984910STATEN SOLAR CORPORATION (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJun 29, 2013Jun 30, 202752

License numbers are the ones the utilities recorded on the interconnection applications (53 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 984910. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Alameda19
Kern12
Santa Clara11
Contra Costa2
San Joaquin2
San Mateo2
Los Angeles1
Nevada1
Riverside1
Solano1
Ventura1
Yolo1

Top cities

CityInstalls
Fremont14
Bakersfield11
San Jose6
Cupertino4
Union City3
Stockton2
Burlingame1
Davis1
Dublin1
El Cerrito1
Hillsborough1
Morgan Hill1
Nevada City1
Ojai1
Pasadena1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
STATEN SOLAR CORPORATION32
Staten Solar19
Staten Solar Corp2
Staten Solar Corporation1

Common questions

Where does Staten Solar install solar?

Its installs are spread across 12 counties. The most are in Alameda County (19 installs), followed by Kern County (12).

How often does Staten Solar install batteries with solar?

16.7% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2).

How many Staten Solar installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 54 interconnected installs (1.9% of the 54 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.