Spectrum Energy Development Inc

How many solar installs has Spectrum Energy Development Inc done in California, and which license number is on its installs?

Spectrum Energy Development Inc has 54 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Mar 22, 2012 to Feb 4, 2026), most of them in Fresno County (11), Kern County (9) and Calaveras County (8). CSLB lists license 892475 (SPECTRUM ENERGY DEVELOPMENT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
54
Last 24 months
2
Total capacity
1,779.3 kW DC
Median system size
15.3 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 22, 2012
Latest install
Feb 4, 2026
Counties
13
Utilities
PGE 53, SCE 1
CSLB license
892475

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012240
201310
201450
201510
201600
201740
201800
201930
202080
202150
202200
202300
202410
202500
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03259.3%not counted
NEM 2.02240.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Spectrum Energy Development Inc’s installs. No residential system in the file lists a third-party owner name that matches Spectrum Energy Development Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Spectrum Energy Development Inc’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as VSUN (Vietnam Sunergy).

In the last 24 months, 2 of Spectrum Energy Development Inc’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Astronergy (Chint).

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVSUN (Vietnam Sunergy)2not in top list
Inverter makerAstronergy (Chint)28

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 54 installs, inverters on 54. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Spectrum Energy Development Inc as developer on 6 battery storage projects and as installer on 6 (6 name it as both), 6 projects in all with 470 kWh of storage. 1 have the status Paid, with $7,425 in current incentive allocations. Applications were received from Jul 17, 2018 to Nov 13, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid122$7,425
Reserved269$62,143
Cancelled3380$137,251

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Storage Equity390$69,5681$7,425
Non-Residential Storage Equity279$62,1430$0
Large-Scale Storage1300$75,1080$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
892475SPECTRUM ENERGY DEVELOPMENT INC (Corporation)CLEARC-10 Electrical ContractorMar 10, 2007Mar 31, 202723

License numbers are the ones the utilities recorded on the interconnection applications (23 of 54 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 892475. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Spectrum Energy Development Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021Total
unincorporated Marin County892475112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Fresno11
Kern9
Calaveras8
Yolo8
Yuba7
Butte3
San Joaquin2
Alameda1
El Dorado1
Madera1
Placer1
San Luis Obispo1
Tulare1

Top cities

CityInstalls
Fresno11
Arvin9
Angels Camp7
Davis7
Olivehurst7
Chico3
Stockton2
Berkeley1
Clarksburg1
El Dorado Hills1
Granite Bay1
Madera1
Paso Robles1
Visalia1
Wallace1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Spectrum Energy Development Inc36
SPECTRUM ENERGY DEVELOPMENT, INC.11
SPECTRUM ENERGY DEVELOPMENT INC7

Common questions

Where does Spectrum Energy Development Inc install solar?

Its installs are spread across 13 counties. The most are in Fresno County (11 installs), followed by Kern County (9).

How often does Spectrum Energy Development Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2).

How many Spectrum Energy Development Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 54 interconnected installs with a tariff recorded (54) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.