Soorya Unlimited

How many solar installs has Soorya Unlimited done in California, and which license number is on its installs?

Soorya Unlimited has 35 residential solar installs interconnected in California, active in the records from 2016 through 2024 (Mar 16, 2016 to Sep 3, 2024), most of them in San Diego County (14), Fresno County (6) and San Luis Obispo County (6). CSLB lists license 980167 (sole owner license, name not shown) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
35
Last 24 months
1
Total capacity
333.3 kW DC
Median system size
7.3 kW DC
With battery storage
5.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 35 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jun 13, 2024
Ownership types recorded
none recorded
First install
Mar 16, 2016
Latest install
Sep 3, 2024
Counties
9
Utilities
PGE 16, SDGE 15, SCE 4
CSLB license
980167

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201630
201720
201830
201940
202040
202130
202260
202380
202421
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 35 interconnected installs (2.9% of the 35 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 13, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.038.6%not counted
NEM 2.03188.6%0 (0.0%)
Net Billing Tariff12.9%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Soorya Unlimited’s installs. No residential system in the file lists a third-party owner name that matches Soorya Unlimited exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Soorya Unlimited’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Znshine.

In the last 24 months, 1 of Soorya Unlimited’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Soorya Unlimited’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine119
Inverter makerEnphase126
Battery makerTesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 35 installs, inverters on 35. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Soorya Unlimited as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 277 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 23, 2016 to Aug 15, 2019.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled2277$78,870

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage1232$43,5000$0
Not stated145$35,3700$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
980167Sole owner license (name not shown)Contr Bond SuspC-46 Solar ContractorJan 12, 2013Jan 31, 202732

License numbers are the ones the utilities recorded on the interconnection applications (32 of 35 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 980167. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Soorya Unlimited’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County98016722

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego14
Fresno6
San Luis Obispo6
Los Angeles3
Yolo2
Monterey1
Orange1
Santa Clara1
Ventura1

Top cities

CityInstalls
San Diego9
Clovis5
Morro Bay3
San Luis Obispo2
West Sacramento2
Carlsbad1
Cayucos1
Cerritos1
Diamond Bar1
Escondido1
Fresno1
La Jolla1
Milpitas1
Rowland Heights1
Salinas1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Soorya Unlimited19
SOORYA UNLIMITED16

Common questions

Where does Soorya Unlimited install solar?

Its installs are spread across 9 counties. The most are in San Diego County (14 installs), followed by Fresno County (6).

How often does Soorya Unlimited install batteries with solar?

5.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Soorya Unlimited installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 35 interconnected installs (2.9% of the 35 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.