SoLink Energy

How many solar installs has SoLink Energy done in California, and which license number is on its installs?

SoLink Energy has 120 residential solar installs interconnected in California, active in the records from 2018 through 2026 (May 9, 2018 to Mar 23, 2026), most of them in San Diego County (105), Orange County (12) and Riverside County (2). CSLB lists license 905681 (SOLINK ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
120
Last 24 months
7
Total capacity
725 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 120 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Jan 13, 2026
Ownership types recorded
none recorded
First install
May 9, 2018
Latest install
Mar 23, 2026
Counties
4
Utilities
SDGE 112, SCE 8
CSLB license
905681

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201880
2019340
2020180
2021100
2022170
2023210
202480
202520
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 120 interconnected installs (5.8% of the 120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jan 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011394.2%0 (0.0%)
Net Billing Tariff75.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SoLink Energy’s installs. No residential system in the file lists a third-party owner name that matches SoLink Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of SoLink Energy’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used modules recorded as Qcells.

In the last 24 months, 7 of SoLink Energy’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells496
JinkoSolar1not in top list
Solaria1not in top list
Inverter makerSolarEdge7115
SMA11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 112 of 120 installs, inverters on 120. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SoLink Energy as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 157 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 3, 2021 to Nov 3, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
PBI in Process1157$48,491

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage1157$48,4910$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
905681SOLINK ENERGY (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorOct 26, 2007Sep 30, 2027120

License numbers are the ones the utilities recorded on the interconnection applications (120 of 120 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 905681. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SoLink Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County90568141084751140

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego105
Orange12
Riverside2
Los Angeles1

Top cities

CityInstalls
San Diego46
La Mesa12
El Cajon10
Chula Vista5
Santee4
Vista4
Carlsbad3
Lakeside3
Lemon Grove3
Ramona3
Spring Valley3
Escondido2
National City2
Oceanside2
Corona1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SoLink Energy112
SOLINK ENERGY5
Solink Energy3

Common questions

Where does SoLink Energy install solar?

Its installs are spread across 4 counties. The most are in San Diego County (105 installs), followed by Orange County (12).

How often does SoLink Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SoLink Energy installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 120 interconnected installs (5.8% of the 120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.