SOLARSESAME INC

How many solar installs has SOLARSESAME INC done in California, and which license number is on its installs?

SOLARSESAME INC has 62 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Nov 4, 2024 to Aug 6, 2026), most of them in Alameda County (20), San Mateo County (14) and Contra Costa County (7). CSLB lists license 1116168 (SOLARSESAME INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-39, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
62
Last 24 months
62
Total capacity
433.9 kW DC
Median system size
6.5 kW DC
With battery storage
90.3% all time; 90.3% last 24 months
Third-party owned
59.7% of 62 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
58 installs, latest Aug 6, 2026
Ownership types recorded
PPA 37
Median battery size
13.8 kWh (40 installs list a capacity)
First install
Nov 4, 2024
Latest install
Aug 6, 2026
Counties
13
Utilities
PGE 57, SCE 5
CSLB license
1116168

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202455
20252321
2026 (through Aug 31, 2026)3430

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

58 of its 62 interconnected installs (93.5% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.046.5%1 (25.0%)
Net Billing Tariff5893.5%55 (94.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 37 of SOLARSESAME INC’s installs the utility recorded a third-party ownership type: PPA 37, lease 0, prepaid lease 0, other 0. Across all installers, 33 residential systems list a third-party owner name that matches SOLARSESAME INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SolarSesame Inc33
GoodLeap3
EnFin1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 59 of SOLARSESAME INC’s 62 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 69.5%) used modules recorded as Qcells.

In the last 24 months, 62 of SOLARSESAME INC’s 62 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 74.2%) used inverters recorded as Tesla.

In the last 24 months, 43 of SOLARSESAME INC’s 62 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (35, 81.4%) used batteries recorded as Tesla.

43 of 56 battery-paired PG&E and SCE installs (76.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4141
Hyundai1010
JA Solar99
SunPower44
Canadian Solar33
Inverter makerTesla4646
Enphase1717
SolarEdge55
Qcells44
SunPower44
Battery makerTesla3535
Enphase88

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 59 of 62 installs, inverters on 62. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLARSESAME INC as developer on 5 battery storage projects and as installer on 5 (5 name it as both), 5 projects in all with 119 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Dec 16, 2025 to Dec 22, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled5119$96,000

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency5119$96,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1116168SOLARSESAME INC (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing ContractorFeb 7, 2024Feb 29, 202862

License numbers are the ones the utilities recorded on the interconnection applications (62 of 62 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1116168. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLARSESAME INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202420252026Total
City and County of San Francisco11161681432165

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Alameda20
San Mateo14
Contra Costa7
Santa Clara7
San Francisco4
Riverside2
San Joaquin2
Los Angeles1
Marin1
Orange1
Placer1
Solano1
Ventura1

Top cities

CityInstalls
Oakland6
Fremont5
Hayward4
San Francisco4
Hillsborough3
Redwood City3
San Jose3
San Ramon3
South San Francisco3
Los Gatos2
Richmond2
Beaumont1
Belmont1
Brentwood1
Cupertino1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARSESAME INC62

Common questions

Where does SOLARSESAME INC install solar?

Its installs are spread across 13 counties. The most are in Alameda County (20 installs), followed by San Mateo County (14).

How often does SOLARSESAME INC install batteries with solar?

90.3% of its interconnected solar installs include battery storage across all years, and 90.3% in the last 24 months (56 of 62).

How many SOLARSESAME INC installs are under NEM 3.0 (the Net Billing Tariff)?

58 of its 62 interconnected installs (93.5% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.