PACIFICSKY SOLAR LLC

How many solar installs has PACIFICSKY SOLAR LLC done in California, and which license number is on its installs?

PACIFICSKY SOLAR LLC has 1,000 residential solar installs interconnected in California, active in the records from 2015 through 2026 (May 15, 2015 to Aug 31, 2026), most of them in Los Angeles County (661), Ventura County (143) and San Bernardino County (67). CSLB lists license 1004379 (PACIFICSKY SOLAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,000
Last 24 months
229
Total capacity
6,982 kW DC
Median system size
6.2 kW DC
With battery storage
23.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 78.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
9.8% of 999 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
273 installs, latest Aug 31, 2026
Ownership types recorded
PPA 89, lease 9
Median battery size
5 kWh (227 installs list a capacity)
First install
May 15, 2015
Latest install
Aug 31, 2026
Counties
15
Utilities
SCE 971, PGE 20, SDGE 9
CSLB license
1004379

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201590
201650
2017670
2018851
2019764
2020580
2021763
202214413
20231938
20247736
202511580
2026 (through Aug 31, 2026)9587

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

273 of its 1,000 interconnected installs (27.3% of the 1,000 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0131.3%not counted
NEM 2.071471.4%33 (4.7%)
Net Billing Tariff27327.3%199 (72.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 98 of PACIFICSKY SOLAR LLC’s installs the utility recorded a third-party ownership type: PPA 89, lease 9, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PACIFICSKY SOLAR LLC exactly.

Third-party owner named on its installsInstalls
LightReach73
Enfin7
Everbright7
SunPower4
Spruce3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 229 of PACIFICSKY SOLAR LLC’s 229 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (79, 34.5%) used modules recorded as Znshine.

In the last 24 months, 229 of PACIFICSKY SOLAR LLC’s 229 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (187, 81.7%) used inverters recorded as Enphase.

In the last 24 months, 169 of PACIFICSKY SOLAR LLC’s 229 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (147, 87.0%) used batteries recorded as Enphase.

216 of 232 battery-paired PG&E and SCE installs (93.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine79129
Hyundai6794
Qcells25247
JA Solar21not in top list
REC1062
Inverter makerEnphase187471
SolarEdge17385
APsystems (Altenergy Power System)1121
Generac8not in top list
Tesla727
Battery makerEnphase147184
Tesla1010
Generac89
Battery1not in top list
Enpahse1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 966 of 1,000 installs, inverters on 1,000. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PACIFICSKY SOLAR LLC as developer on 26 battery storage projects and as installer on 27 (25 name it as both), 28 projects in all with 408 kWh of storage. 22 have the status Paid, with $78,407 in current incentive allocations. Applications were received from Jan 11, 2021 to Nov 29, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid22318$78,407
Cancelled691$37,663

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage23302$49,87119$40,748
Large-Scale Storage368$27,3752$18,248
Equity Resiliency239$38,8241$19,412

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1004379PACIFICSKY SOLAR LLC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 11, 2015Jun 30, 2027990

License numbers are the ones the utilities recorded on the interconnection applications (998 of 1,000 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1004379. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PACIFICSKY SOLAR LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019202020222026Total
unincorporated San Diego County100437911114

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles661
Ventura143
San Bernardino67
Orange57
Riverside38
Kern19
San Diego5
San Mateo2
Santa Barbara2
Alameda1
Contra Costa1
Marin1
San Luis Obispo1
Santa Clara1
Tulare1

Top cities

CityInstalls
Simi Valley64
South Gate48
Huntington Park31
Lynwood26
Long Beach25
Los Angeles25
San Fernando24
Calabasas22
Santa Clarita22
Bell20
Lancaster20
Palmdale18
Thousand Oaks18
Whittier17
Agoura Hills16

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PACIFICSKY SOLAR LLC973
PACIFICSKY SOLAR9
PacificSky Solar8
Pacificsky Solar LLC7
Pacificsky Solar2
Pacificsky solar1

Common questions

Where does PACIFICSKY SOLAR LLC install solar?

Its installs are spread across 15 counties. The most are in Los Angeles County (661 installs), followed by Ventura County (143).

How often does PACIFICSKY SOLAR LLC install batteries with solar?

23.4% of its interconnected solar installs include battery storage across all years, and 78.2% in the last 24 months (179 of 229). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many PACIFICSKY SOLAR LLC installs are under NEM 3.0 (the Net Billing Tariff)?

273 of its 1,000 interconnected installs (27.3% of the 1,000 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.