ADR Electric Inc

How many solar installs has ADR Electric Inc done in California, and which license number is on its installs?

ADR Electric Inc has 663 residential solar installs interconnected in California, active in the records from 2008 through 2017 (Oct 2, 2008 to Jul 3, 2017), most of them in Los Angeles County (451), Ventura County (129) and Orange County (28). The license number recorded on most of its installs, 696338, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 1004379 (PACIFICSKY SOLAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2027, recorded on 130 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to ADR Electric Inc here carry more than one CSLB license number: 696338 on 404 (not found in the CSLB License Master file) and 1004379 on 130 (CSLB holder PACIFICSKY SOLAR LLC, Chatsworth), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
663
Last 24 months
0
Total capacity
3,920.6 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
41.3% of 569 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, lease 233, other 1
First install
Oct 2, 2008
Latest install
Jul 3, 2017
Counties
9
Utilities
SCE 651, SDGE 8, PGE 4
CSLB license
696338, 1004379

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200840
2009120
2010330
2011500
2012310
20131620
2014910
2015680
20161220
2017900
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 663 interconnected installs with a tariff recorded (663) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0663100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 235 of ADR Electric Inc’s installs the utility recorded a third-party ownership type: PPA 1, lease 233, prepaid lease 0, other 1. Across all installers, 2 residential systems list a third-party owner name that matches ADR Electric Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Capital, LLC150
SunPower54
SunPower Solar Program I, LLC13
Greenspire9
MYSOLAR I,LLC3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 253 of ADR Electric Inc’s 663 installs name a module maker in the “Generator Manufacturer” fields, and most of those (172, 68.0%) used modules recorded as SunPower.

Across all years, 660 of ADR Electric Inc’s 663 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (207, 31.4%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0172
SolarWorld027
Canadian Solar026
Panasonic011
Hyundai05
Inverter makerSMA0207
SunPower0134
ABB0119
Power-One082
SolarEdge067

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 253 of 663 installs, inverters on 660. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
696338Not found in the CSLB License Master file pulled Nov 4, 2026404
1004379PACIFICSKY SOLAR LLC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 11, 2015Jun 30, 2027130

License numbers are the ones the utilities recorded on the interconnection applications (534 of 663 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1004379. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles451
Ventura129
Orange28
San Bernardino28
Riverside13
San Diego6
Kern5
Santa Barbara2
Tulare1

Top cities

CityInstalls
Simi Valley49
Calabasas28
Agoura Hills25
Thousand Oaks25
Lancaster22
Canyon Country20
Palmdale18
Camarillo16
Long Beach16
Arcadia15
Valencia15
Santa Clarita13
Altadena12
Castaic12
Westlake Village12

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ADR ELECTRIC282
ADR Electric Inc247
ADR ELECTRIC INC73
ADR Electric61

Common questions

Where does ADR Electric Inc install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (451 installs), followed by Ventura County (129).

How often does ADR Electric Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ADR Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 663 interconnected installs with a tariff recorded (663) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.