Pacific Sun Technologies

How many solar installs has Pacific Sun Technologies done in California, and which license number is on its installs?

Pacific Sun Technologies has 710 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Dec 28, 2007 to Aug 28, 2026), most of them in Riverside County (237), Orange County (197) and San Diego County (122). CSLB lists license 896158 (PACIFIC SUN TECHNOLOGIES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-2, C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
710
Last 24 months
152
Total capacity
6,189.8 kW DC
Median system size
8.1 kW DC
With battery storage
38.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 96.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.4% of 706 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
147 installs, latest Aug 28, 2026
Ownership types recorded
PPA 10
Median battery size
13.5 kWh (210 installs list a capacity)
First install
Dec 28, 2007
Latest install
Aug 28, 2026
Counties
7
Utilities
SCE 540, SDGE 168, PGE 2
CSLB license
896158

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200710
200840
200940
201060
201110
201200
201300
201400
2015100
201670
2017102
2018114
2019241
2020442
20217410
202213130
202320019
20246247
20258668
2026 (through Aug 31, 2026)3527

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

147 of its 710 interconnected installs (20.7% of the 709 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.2% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0385.4%not counted
NEM 2.052473.9%98 (24.9%)
Net Billing Tariff14720.7%111 (98.2%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of Pacific Sun Technologies’s installs the utility recorded a third-party ownership type: PPA 10, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Pacific Sun Technologies exactly.

Third-party owner named on its installsInstalls
ORE Developer Corporate Entity5
OneRoof Energy4
Sunlight Financing1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 149 of Pacific Sun Technologies’ 152 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (56, 37.6%) used modules recorded as REC.

In the last 24 months, 151 of Pacific Sun Technologies’ 152 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (88, 58.3%) used inverters recorded as Tesla.

In the last 24 months, 119 of Pacific Sun Technologies’ 152 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (78, 65.5%) used batteries recorded as Tesla.

192 of 210 battery-paired PG&E and SCE installs (91.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC56203
Qcells25258
Canadian Solar1547
Aptos Solar9not in top list
Silfab9not in top list
Inverter makerTesla88113
Enphase45338
SolarEdge9137
EternalplanetEnergyCo.,Ltd2not in top list
Shenzhen Eternalplanet Energy Pingshan Ltd.2not in top list
Battery makerTesla7885
Enphase2774
FranklinWH78
Shenzhen Eternalplanet Energy Pingshan Ltd.38
Canadian Solar1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 661 of 710 installs, inverters on 709. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Pacific Sun Technologies as developer on 106 battery storage projects and as installer on 106 (106 name it as both), 106 projects in all with 1,675 kWh of storage. 65 have the status Paid, with $334,651 in current incentive allocations. Applications were received from Jul 12, 2019 to Aug 12, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid651,038$334,651
Reserved458$9,114
Cancelled37579$169,529

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage68981$147,56443$96,929
Large-Scale Storage24368$82,45612$48,268
Equity Resiliency14326$283,27410$189,454

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
896158PACIFIC SUN TECHNOLOGIES INC (Corporation)CLEAR, WC Susp PendingA General Engineering Contractor; B General Building Contractor; C-2; C-10 Electrical ContractorMay 9, 2007May 31, 2027706

License numbers are the ones the utilities recorded on the interconnection applications (706 of 710 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 896158. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Pacific Sun Technologies’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County8961583414472227

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside237
Orange197
San Diego122
Los Angeles90
San Bernardino51
Ventura11
Alameda2

Top cities

CityInstalls
Temecula46
San Diego42
Murrieta39
Rancho Santa Margarita37
Corona19
Escondido19
Mission Viejo18
Las Flores15
Trabuco Canyon15
Menifee14
Hemet13
Lake Elsinore13
Riverside12
Chula Vista10
Irvine10

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PACIFIC SUN TECHNOLOGIES INC504
Pacific Sun Technologies186
Pacific Sun Technologies, Inc.17
PACIFIC SUN TECHNOLOGIES, INC.2
PACIFIC SUN TECHNOLOGIES1

Common questions

Where does Pacific Sun Technologies install solar?

Its installs are spread across 7 counties. The most are in Riverside County (237 installs), followed by Orange County (197).

How often does Pacific Sun Technologies install batteries with solar?

38.7% of its interconnected solar installs include battery storage across all years, and 96.7% in the last 24 months (119 of 123). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Pacific Sun Technologies installs are under NEM 3.0 (the Net Billing Tariff)?

147 of its 710 interconnected installs (20.7% of the 709 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.2% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.