New Leaf Electric

How many solar installs has New Leaf Electric done in California, and which license number is on its installs?

New Leaf Electric has 707 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jan 12, 2016 to Apr 2, 2026), most of them in San Diego County (615), Orange County (60) and Riverside County (24). CSLB lists license 1034853 (NEW LEAF ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
707
Last 24 months
13
Total capacity
5,699.7 kW DC
Median system size
7 kW DC
With battery storage
19.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.4% of 707 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Apr 29, 2025
Ownership types recorded
PPA 1, lease 1, prepaid lease 1
Median battery size
24 kWh (11 installs list a capacity)
First install
Jan 12, 2016
Latest install
Apr 2, 2026
Counties
6
Utilities
SDGE 651, SCE 55, PGE 1
CSLB license
1034853

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
201780
2018360
2019810
2020731
2021784
20221533
20232341
2024321
202591
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 707 interconnected installs (1.1% of the 707 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 29, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.1%not counted
NEM 2.069898.7%10 (18.2%)
Net Billing Tariff81.1%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of New Leaf Electric’s installs the utility recorded a third-party ownership type: PPA 1, lease 1, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches New Leaf Electric exactly.

Third-party owner named on its installsInstalls
New Leaf Electric In2
Vaha Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of New Leaf Electric’s 13 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 38.5%) used modules recorded as Qcells.

In the last 24 months, 13 of New Leaf Electric’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10, 76.9%) used inverters recorded as Enphase.

In the last 24 months, none of New Leaf Electric’s 13 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

3 of 11 battery-paired PG&E and SCE installs (27.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells5310
REC262
Solaria271
Fortress Power LLC1not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.1not in top list
Inverter makerEnphase10527
Schneider Electric2not in top list
Shenzhen Sinexcel Electric1not in top list
Battery makerEnphase02
LG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 663 of 707 installs, inverters on 707. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names New Leaf Electric as developer on 23 battery storage projects and as installer on 30 (23 name it as both), 30 projects in all with 1,144 kWh of storage. 23 have the status Paid, with $831,321 in current incentive allocations. Applications were received from Jun 6, 2017 to May 26, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid23951$831,321
Cancelled6179$173,950
RRF Rejected114$2,779

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency21971$961,90415$787,954
Small Residential Storage569$12,5455$12,545
Large-Scale Storage390$30,8213$30,821
Not stated114$2,7790$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1034853NEW LEAF ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJan 12, 2018Jan 31, 2028697

License numbers are the ones the utilities recorded on the interconnection applications (706 of 707 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1034853. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list New Leaf Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County1034853122125235344312184

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego615
Orange60
Riverside24
Los Angeles5
San Bernardino2
San Luis Obispo1

Top cities

CityInstalls
San Diego254
Fallbrook78
Chula Vista35
Oceanside28
Carlsbad25
Escondido21
Vista20
El Cajon19
La Mesa17
Rancho Santa Fe14
Rch Msn Viejo13
San Marcos11
Ramona10
Temecula10
Encinitas9

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
New Leaf Electric652
NEW LEAF ELECTRIC INC55

Common questions

Where does New Leaf Electric install solar?

Its installs are spread across 6 counties. The most are in San Diego County (615 installs), followed by Orange County (60).

How often does New Leaf Electric install batteries with solar?

19.6% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many New Leaf Electric installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 707 interconnected installs (1.1% of the 707 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.