LE HOMES

How many solar installs has LE HOMES done in California, and which license number is on its installs?

LE HOMES has 326 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jan 31, 2022 to Jul 17, 2026), most of them in Fresno County (112), Tulare County (71) and Kern County (31). CSLB lists license 1081251 (LE HOMES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
326
Last 24 months
113
Total capacity
2,210.6 kW DC
Median system size
6.5 kW DC
With battery storage
36.5% all time; 93.8% last 24 months
Third-party owned
1.5% of 326 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
253 installs, latest Jul 17, 2026
Ownership types recorded
PPA 5
Median battery size
5 kWh (16 installs list a capacity)
First install
Jan 31, 2022
Latest install
Jul 17, 2026
Counties
15
Utilities
PGE 245, SCE 81
CSLB license
1081251

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022310
2023920
202411434
20258179
2026 (through Aug 31, 2026)86

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

253 of its 326 interconnected installs (77.6% of the 326 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 42.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.051.5%not counted
NEM 2.06820.9%7 (10.3%)
Net Billing Tariff25377.6%107 (42.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of LE HOMES’s installs the utility recorded a third-party ownership type: PPA 5, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches LE HOMES exactly.

Third-party owner named on its installsInstalls
GoodLeap LLC5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 106 of LE HOMES’ 113 installs name a module maker in the “Generator Manufacturer” fields, and most of those (96, 90.6%) used modules recorded as Qcells.

In the last 24 months, 113 of LE HOMES’ 113 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (96, 85.0%) used inverters recorded as Enphase.

In the last 24 months, 99 of LE HOMES’ 113 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (80, 80.8%) used batteries recorded as Enphase.

111 of 119 battery-paired PG&E and SCE installs (93.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells96213
JinkoSolar912
LONGi3not in top list
REC3not in top list
Canadian Solar24
Inverter makerEnphase96284
SolarEdge2658
Fronius47
ABB2not in top list
APsystems (Altenergy Power System)1not in top list
Battery makerEnphase8092
SolarEdge1818
LG11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 287 of 326 installs, inverters on 326. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1081251LE HOMES (Corporation)CLEAR, Pending Case/CITB General Building ContractorSep 15, 2021Sep 30, 2027326

License numbers are the ones the utilities recorded on the interconnection applications (326 of 326 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1081251. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno112
Tulare71
Kern31
Kings31
Monterey25
Madera14
Merced13
San Joaquin9
Santa Clara8
Alameda4
Contra Costa2
Los Angeles2
Santa Cruz2
Sonoma1
Yuba1

Top cities

CityInstalls
Fresno33
Mendota19
Orange Cove17
Woodlake14
Avenal13
Lost Hills13
Delano11
Madera11
Parlier11
Coalinga10
Porterville10
Huron8
King City8
San Jose8
Farmersville7

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LE HOMES326

Common questions

Where does LE HOMES install solar?

Its installs are spread across 15 counties. The most are in Fresno County (112 installs), followed by Tulare County (71).

How often does LE HOMES install batteries with solar?

36.5% of its interconnected solar installs include battery storage across all years, and 93.8% in the last 24 months (106 of 113).

How many LE HOMES installs are under NEM 3.0 (the Net Billing Tariff)?

253 of its 326 interconnected installs (77.6% of the 326 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 42.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.