Golden Bear Solar

How many solar installs has Golden Bear Solar done in California, and which license number is on its installs?

Golden Bear Solar has 293 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jan 29, 2015 to Aug 19, 2026), most of them in Santa Clara County (144), Santa Cruz County (48) and San Mateo County (28). CSLB lists license 940091 (GOLDEN BEAR SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Golden Bear Solar here carry more than one CSLB license number: 940091 on 253 (CSLB holder GOLDEN BEAR SOLAR INC, Los Gatos) and 923707 on 36 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
293
Last 24 months
56
Total capacity
2,254.9 kW DC
Median system size
7 kW DC
With battery storage
34.5% all time; 73.2% last 24 months
Third-party owned
0.0% of 293 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
43 installs, latest Aug 19, 2026
Ownership types recorded
none recorded
Median battery size
13.8 kWh (18 installs list a capacity)
First install
Jan 29, 2015
Latest install
Aug 19, 2026
Counties
15
Utilities
PGE 293
CSLB license
940091, 923707

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015140
2016210
201710
201800
2019180
2020242
20215022
20225216
20234613
20242113
20252622
2026 (through Aug 31, 2026)2013

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

43 of its 293 interconnected installs (14.7% of the 293 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04214.3%not counted
NEM 2.020871.0%57 (27.4%)
Net Billing Tariff4314.7%39 (90.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Golden Bear Solar’s installs. No residential system in the file lists a third-party owner name that matches Golden Bear Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 54 of Golden Bear Solar’s 56 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 38.9%) used modules recorded as CertainTeed.

In the last 24 months, 56 of Golden Bear Solar’s 56 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 57.1%) used inverters recorded as Enphase.

In the last 24 months, 40 of Golden Bear Solar’s 56 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (15, 37.5%) used batteries recorded as Enphase.

85 of 101 battery-paired PG&E and SCE installs (84.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed21100
REC1418
Qcells856
Hyundai2not in top list
Andalay1not in top list
Inverter makerEnphase32234
Tesla1313
Lunar Energy1111
SMA214
SunPower2not in top list
Battery makerEnphase1560
Tesla1313
Lunar Energy1111
Stackrack Battery Systems11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 264 of 293 installs, inverters on 293. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Golden Bear Solar as developer on 11 battery storage projects and as installer on 13 (10 name it as both), 14 projects in all with 279 kWh of storage. 11 have the status Paid, with $93,717 in current incentive allocations. Applications were received from Jul 7, 2020 to Nov 22, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid11221$93,717
Cancelled358$36,517

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage9143$20,4888$17,576
Equity Resiliency5136$109,7473$76,141

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
940091GOLDEN BEAR SOLAR INC (Corporation)CLEARC-10 Electrical ContractorNov 16, 2009Nov 30, 2027253
923707Sole owner license (name not shown)CLEARC-7; C-10 Electrical Contractor; C-46 Solar ContractorOct 16, 2008Jul 31, 202736

License numbers are the ones the utilities recorded on the interconnection applications (293 of 293 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 940091, 923707. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Golden Bear Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202420252026Total
City and County of San Francisco94009114510

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara144
Santa Cruz48
San Mateo28
Alameda17
El Dorado16
Placer12
Contra Costa7
Sonoma5
San Joaquin4
Napa3
San Francisco3
Amador2
Yolo2
Merced1
Solano1

Top cities

CityInstalls
San Jose43
Los Gatos40
Santa Cruz26
Saratoga21
El Dorado Hills11
Scotts Valley9
Sunnyvale9
Cupertino8
Fremont6
Monte Sereno6
Soquel6
Menlo Park5
Mountain View5
Redwood City5
Campbell4

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLDEN BEAR SOLAR INC250
Golden Bear Solar36
Golden Bear Solar Inc6
GOLDEN BEAR SOLAR1

Common questions

Where does Golden Bear Solar install solar?

Its installs are spread across 15 counties. The most are in Santa Clara County (144 installs), followed by Santa Cruz County (48).

How often does Golden Bear Solar install batteries with solar?

34.5% of its interconnected solar installs include battery storage across all years, and 73.2% in the last 24 months (41 of 56).

How many Golden Bear Solar installs are under NEM 3.0 (the Net Billing Tariff)?

43 of its 293 interconnected installs (14.7% of the 293 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.