Energy Concepts has 3,361 residential solar installs interconnected in California, active in the records from 2003 through 2026 (May 27, 2003 to Mar 31, 2026), most of them in Fresno County (2,584), Madera County (313) and Tulare County (257). The license number recorded on most of its installs, 660643, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,361
Last 24 months
64
Total capacity
29,089.7 kW DC
Median system size
8.1 kW DC
With battery storage
6.1% all time; 85.9% last 24 months
Third-party owned
8.1% of 3,358 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
151 installs, latest Apr 28, 2025
Ownership types recorded
PPA 81, lease 191
Median battery size
13.5 kWh (59 installs list a capacity)
First install
May 27, 2003
Latest install
Mar 31, 2026
Counties
11
Utilities
PGE 3,074, SCE 287
CSLB license
660643

Is Energy Concepts still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200360
200440
200500
200640
200710
200820
200950
201060
201180
201290
201370
2014260
20151460
20161790
20172890
20182960
20193482
20203462
20214223
202254239
202356541
202412798
20252220
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

151 of its 3,361 interconnected installs (4.5% of the 3,361 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The latest Net Billing Tariff install was approved Apr 28, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.042112.5%not counted
NEM 2.02,78983.0%74 (2.7%)
Net Billing Tariff1514.5%128 (84.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 272 of Energy Concepts’s installs the utility recorded a third-party ownership type: PPA 81, lease 191, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Energy Concepts exactly.

Third-party owner named on its installsInstalls
SunPower220
SunPower Capital LLC34
Sun Power Capital LLC4
HDM Capital3
Lifestyle Energy Financial LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 54 of Energy Concepts’ 64 installs name a module maker in the “Generator Manufacturer” fields, and most of those (33, 61.1%) used modules recorded as SunPower.

In the last 24 months, 64 of Energy Concepts’ 64 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (38, 59.4%) used inverters recorded as SunPower.

In the last 24 months, 44 of Energy Concepts’ 64 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (32, 72.7%) used batteries recorded as Tesla.

175 of 205 battery-paired PG&E and SCE installs (85.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower332,079
Qcells15180
REC3205
Waaree3not in top list
Silfab1not in top list
Inverter makerSunPower382,033
Tesla27not in top list
Enphase18348
FranklinWH10not in top list
SolarEdge5811
Battery makerTesla3268
FranklinWH77
Enphase310
Qcells1not in top list
SunPower186

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,143 of 3,361 installs, inverters on 3,361. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Energy Concepts as developer on 33 battery storage projects and as installer on 33 (33 name it as both), 33 projects in all with 737 kWh of storage. 14 have the status Paid, with $102,823 in current incentive allocations. Applications were received from Aug 11, 2020 to Aug 30, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid14255$102,823
Cancelled16432$273,002
RRF Rejected349$7,393

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage16268$42,94210$21,142
Equity Resiliency11317$303,4013$71,781
Large-Scale Storage3102$29,4821$9,900
Not stated349$7,3930$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
660643Not found in the CSLB License Master file pulled Nov 4, 20263,306

License numbers are the ones the utilities recorded on the interconnection applications (3,308 of 3,361 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno2,584
Madera313
Tulare257
Kings142
Merced33
San Joaquin11
San Luis Obispo8
Mariposa6
Kern5
Santa Clara1
Sonoma1

Top cities

CityInstalls
Fresno1,338
Clovis859
Madera208
Visalia147
Sanger91
Kingsburg82
Hanford77
Lemoore50
Coarsegold46
Reedley45
Selma34
Kerman33
Dinuba32
Tulare29
Friant25

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ENERGY CONCEPTS ENTERPRISES INC2,059
Energy Concepts917
ENERGY CONCEPTS330
Energy Concepts Enterprises Inc50
Energy Concepts Enterprises2
Energy concepts1
Energy Concepts Enterprises Inc.1
Energy Concepts Enterprises, Inc1

Common questions

Where does Energy Concepts install solar?

Its installs are spread across 11 counties. The most are in Fresno County (2,584 installs), followed by Madera County (313).

How often does Energy Concepts install batteries with solar?

6.1% of its interconnected solar installs include battery storage across all years, and 85.9% in the last 24 months (55 of 64).

How many Energy Concepts installs are under NEM 3.0 (the Net Billing Tariff)?

151 of its 3,361 interconnected installs (4.5% of the 3,361 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.